Installation 

  English  

Servimat M/L — 28.01.2021

 

 CAUTION 

Risk of injury due to falls or bumps 
Bruising from falls or bumps on system components during installation. 

 

Wear personal protective equipment (helmet, protective clothing, gloves,
safety boots). 



Note! 
Confirm that installation and start-up have been carried out correctly 
using the installation, start-up and maintenance certificate. This action 
is a prerequisite for the making of warranty claims. 

Have the Reflex Customer Service carry out commissioning and 
the annual maintenance. 

6.1

Incoming inspection 

Prior to shipping, this device was carefully inspected and packed. Damages 
during transport cannot be excluded. 

Proceed as follows: 
1.

Upon receipt of the goods, check the shipment for

 

completeness and

 

possible transport damage.

2.

Document any damage.

3.

Contact the forwarding agent to register your complaint.

6.2

 

Preparatory work 

Condition of the delivered device: 

 

Check all screw connections of the device for tight seating. Tighten the 
screws as necessary. 

Preparing the device installation: 

 

No access by unauthorised personnel.

 

Frost-free, well-ventilated room.

Room temperature 0 °C to 45 °C (32 °F to 113 °F).

 

Level, stable flooring.

Ensure sufficient bearing strength of the flooring before filling the 
tanks. 

Ensure that the control unit and the tanks are installed on the same 
level. 

 

Filling and dewatering option.

Provide a DN 15 filling connection according to DIN 1988 - 100 and 
En 1717. 

Provide an optional cold water inlet.

Prepare a drain for the drain water.

 

Electric connection 230 V~, 50/60 Hz, 16 A with upstream ELCB: Tripping 
current 0.03 A. 

 

Use only approved transport and lifting equipment.

The load fastening points at the tanks must be used only as 
installation resources. 



Note! 
Comply with the Reflex planning directive.

During planning, take into account that the working range of the 
device must be between the "pa" supply pressure and the "pe" 
final pressure in the working range of the pressure maintenance 
system. 

6.3

Execution 

ATTENTION 

Damage due to improper installation 
Additional device stresses may arise due to the connection of pipes or system 
equipment. 

 

Ensure that pipes are connected from the device to the system without 
them being stressed or strained. 

 

If necessary, provide support structures for the pipes or equipment.

For installation, proceed as follows: 

 

Position the device.

 

Complete the primary tank and the optional secondary tanks.

 

Create the water-side connections of the control unit to the system.

 

Create the interfaces according to the terminal plan.

 

Install the water connections between optional secondary tanks to each 
other and to the primary tank. 



Notice! 
For installation, note the operability of the valves and the inlet options 
of the connecting lines. 

6.3.1

Fitting the add-on components for the vacuum spray pipe 

Fit the "DV" degassing valve with pre-assembled check valve on the "VT" vacuum 
spray pipe.  
For optimum reliability, we recommend braided sealing tape (PTFE) or pipe 
sealing cord (polyamide ww. PTFE) as a seal. 
Check all screw fittings of the device for proper seating. 

6.3.2

Positioning 

Specify the position of the control unit and primary tank: 

 

Servimat: 
The control unit can be installed on either side or in front of the primary 
tank. The distance of the control unit to the primary tank results from the
connection set supplied. 

6.3.3

Installation of add-on components for the tanks 

The add-on components are packed in plastic bags and attached to the base of 
the tanks. 

 

Pressure compensation elbow (1).

 

Reflex Exvoid with pre-fitted check valve (2)

 

"LIS" pressure pick-up

For add-on components, proceed as follows: 
1.

Install the Reflex Exvoid (2) at the connection of the corresponding tank. 
For optimum reliability, we recommend braided sealing tape (PTFE) or pipe
sealing cord (polyamide ww. PTFE) as a seal. 

2.

Remove the protective cap from the degassing valve.

3.

Use the compression fitting to install the pressure compensation elbow (1)
for ventilation at the tanks. 



Note! 
Install the "LIS" pressure pick-up only after finalising the installation of 
the primary tank, see chapter 6.3.6 "Fitting the level sensor" on page 10 . 



Note! 
To ensure fault-free operation, do not seal off the ventilation. 

Содержание Servimat L

Страница 1: ...Servimat M L 09 04 2019 Pressure maintenance with degassing GB Operating manual Original operating manual...

Страница 2: ...nstallation and commissioning certificate 13 7 Commissioning 13 7 1 Checking the requirements for commissioning 13 7 2 Determining the P0 minimum operating pressure for the controller 13 7 3 Filling t...

Страница 3: ...ice on page 25 3 Safety 3 1 Explanation of symbols The following symbols and signal words are used in this operating manual DANGER Danger of death and or serious damage to health The sign in combinati...

Страница 4: ...afety clothing gloves and goggles for example 4 Description of the device 4 1 Description The Servimat is a pump controlled pressure maintaining make up and degassing station for heating and cooling w...

Страница 5: ...water from the primary tank back into the system The pressure in the facility system rises The controller ensures that the pressure is maintained further supported by the stabilisation provided by th...

Страница 6: ...ontent is shown on the packing Immediately after receipt of the goods please check the shipment for completeness and damage Please notify us immediately of any transport damage Basic pressure maintena...

Страница 7: ...54 G1 1360 146 6 bar 400 740 65 G1 1345 133 Type D mm Weight kg Connection inches H mm h mm 6 bar 500 740 78 G1 1560 133 6 bar 600 740 94 G1 1810 133 6 bar 800 740 149 G1 2275 133 6 bar 1000 740 740...

Страница 8: ...ATTENTION Damage due to improper installation Additional device stresses may arise due to the connection of pipes or system equipment Ensure that pipes are connected from the device to the system wit...

Страница 9: ...tank Ensure that you connect the connection set for the overflow collector to the connection 2 below the label 1 Interchanging the connections may cause the pump to run dry For tanks up to 740 mm Con...

Страница 10: ...mal insulation when condensate forms 6 3 6 Fitting the level sensor ATTENTION Damage to the pressure load cell due to unprofessional installation Incorrect installation may result in damage to the LIS...

Страница 11: ...ain circuit board is voltage free 3 Insert a suitable screwed cable gland for the cable bushings at the rear of the connection component M16 or M20 for example 4 Thread all cables to be connected thro...

Страница 12: ...44 E1 E1 Contact water meter Factory provided 45 E2 Insufficient water switch E2 LSL 51 GND 52 24 V supply 53 0 10 V correcting variable 54 0 10 V feedback 55 GND Pressure relief valve control ball va...

Страница 13: ...on in the Maintenance certificate see chapter 10 5 Maintenance certificate on page 24 For the installation Place date Company Signature For the commissioning Place date Company Signature 7 Commissioni...

Страница 14: ...height 18 m run on temperature 70 C 158 F safety temperature 100 C 212 F Example calculation for suction pressure maintenance P0 pst pD 0 2 bar pst hst 10 pst 18 m 10 pst 1 8 bar pD 0 0 bar at a safet...

Страница 15: ...the VT vacuum spray pipe The venting screw at the PU pump 8 After successful conclusion of the vacuum test open the ball valve 2 9 If the controller displays the Insufficient water error message ackno...

Страница 16: ...ure relief valve WV1 Safe Control make up valve MKH3 Opening closing of tank spray pipe to the system The change in the filling level and the tank pressure are indicated on the display Note Manual ope...

Страница 17: ...ully calibrated 9 3 Modifying the controller s start routine Note For handling the operator panel see chapter 9 1 Operator panel on page 17 The start routine is used to set the required parameters for...

Страница 18: ...ccessfully completed you cannot commission the device In this case please contact Customer Service see chapter 12 1 Reflex Customer Service on page 25 9 Once null balancing has concluded successfully...

Страница 19: ...ress X to cancel your input without saving the new settings The controller automatically opens again the list 9 3 2 Service menu This menu is protected with a password It can be accessed only by the R...

Страница 20: ...24 hours The times for interval degassing are stored in the Service menu Daily start of interval degassing is at 8 00 a m Note Manual activation of the degassing program takes place in the customer me...

Страница 21: ...valve does not open Check set value in the Customer or Service menu Clean the dirt trap Check functioning of the PV1 solenoid valve If necessary manually add water 03 High water YES Set value exceeded...

Страница 22: ...and reset the maintenance counter upon completion Quit 24 Replace cartridge Set value for soft water capacity exceeded Replace cartridges Set soft water capacity Quit 25 Datalogger No SD card inserte...

Страница 23: ...ng the dirt trap on page 23 Annually Clean the dirt trap see chapter 9 3 1 Customer menu on page 18 Depending on the operating conditions Check the controller settings see chapter 9 3 3 Default settin...

Страница 24: ...13 Level sensor at the primary tank Preparation 1 Switch to Automatic mode 2 Close the cap valves upstream of the tanks and the EC expansion lines 3 Record the displayed filling level value in 4 Drain...

Страница 25: ...hot medium can cause burns Maintain a sufficient distance from the escaping medium Wear suitable personal protective equipment safety gloves and goggles CAUTION Risk of burns on hot surfaces Hot surf...

Страница 26: ...SI1870enC 9127065 01 21 Reflex Winkelmann GmbH Gersteinstra e 19 59227 Ahlen Germany 49 0 2382 7069 0 49 0 2382 7069 9546 www reflex winkelmann com...

Отзывы: