For the electrical connection, you must differentiate between a connection 
component and an operating component. 

Connection unit 

Covers of the operating unit (folding) 

 

RS-485 interfaces

 

Pressure output

Operating unit (Control Touch controller) 

Cable bushings 

Covers of the connection unit (folding) 

 

Supply and fusing

 

Floating contacts

 

Aggregate connection

The following descriptions apply to standard systems and are limited to the 
necessary user-provided connections. 
1.

Shut down the system and secure it against unintentional reactivation.

2.

Remove the covers. 

DANGER 

 electric shock! Risk of serious injury or death due to electric 

shock. Some parts of the device's circuit board may still be live with 230 V 
even after the device has been physically isolated from the power supply 
by pulling out of the mains plug. Before you remove the covers, completely 
isolate the device controller from the power supply. Verify that the main 
circuit board is voltage-free. 

3.

Insert a suitable screwed cable gland for the cable bushings at the rear of
the connection component. M16 or M20, for example. 

4.

Thread all cables to be connected through the cable glands.

5.

Connect all cables as shown in the terminal diagrams.

Connection unit, see chapter 6.4.1 "Terminal plan, connection
component"
 on page 11 . 

Operating unit, see chapter 6.4.2 "Terminal plan, operating unit" on 
page 12 . 

When providing fusing for the appliance, note its connected load, see 
chapter 5 "Technical data" on page 6 . 

6.

Install the cover.

7.

Connect the mains plug to the 230 V power supply.

8.

Activate the system. 

The electrical connection is completed.

6.4.1

Terminal plan, connection component 

Pressure 

Fuses 

Level 

Terminal 
number 

Signal 

Function 

Wiring 

Supply 
X0/1 

Supply 230 V, maximal 16 A 

User supplied 

X0/2 

N  

X0/3 

PE  

X0/1 

L1 

Supply 400 V, maximal 20 A 

User supplied 

X0/2 

L2 

X0/3 

L3 

X0/4 

N  

X0/5 

PE 

Terminal 
number 

Signal 

Function 

Wiring 

Circuit board 

PE  

Voltage supply 

Factory-
provided 

L  

Y1 

“Safe Control” motorized ball 

valve for make-up (MKH1) WV 

Factory-
provided 

N  

PE  

Y2 

Motorized ball valve to the tank 
(MKH2) 

Factory-
provided 

N  

PE  

Содержание Servimat L

Страница 1: ...Servimat M L 09 04 2019 Pressure maintenance with degassing GB Operating manual Original operating manual...

Страница 2: ...nstallation and commissioning certificate 13 7 Commissioning 13 7 1 Checking the requirements for commissioning 13 7 2 Determining the P0 minimum operating pressure for the controller 13 7 3 Filling t...

Страница 3: ...ice on page 25 3 Safety 3 1 Explanation of symbols The following symbols and signal words are used in this operating manual DANGER Danger of death and or serious damage to health The sign in combinati...

Страница 4: ...afety clothing gloves and goggles for example 4 Description of the device 4 1 Description The Servimat is a pump controlled pressure maintaining make up and degassing station for heating and cooling w...

Страница 5: ...water from the primary tank back into the system The pressure in the facility system rises The controller ensures that the pressure is maintained further supported by the stabilisation provided by th...

Страница 6: ...ontent is shown on the packing Immediately after receipt of the goods please check the shipment for completeness and damage Please notify us immediately of any transport damage Basic pressure maintena...

Страница 7: ...54 G1 1360 146 6 bar 400 740 65 G1 1345 133 Type D mm Weight kg Connection inches H mm h mm 6 bar 500 740 78 G1 1560 133 6 bar 600 740 94 G1 1810 133 6 bar 800 740 149 G1 2275 133 6 bar 1000 740 740...

Страница 8: ...ATTENTION Damage due to improper installation Additional device stresses may arise due to the connection of pipes or system equipment Ensure that pipes are connected from the device to the system wit...

Страница 9: ...tank Ensure that you connect the connection set for the overflow collector to the connection 2 below the label 1 Interchanging the connections may cause the pump to run dry For tanks up to 740 mm Con...

Страница 10: ...mal insulation when condensate forms 6 3 6 Fitting the level sensor ATTENTION Damage to the pressure load cell due to unprofessional installation Incorrect installation may result in damage to the LIS...

Страница 11: ...ain circuit board is voltage free 3 Insert a suitable screwed cable gland for the cable bushings at the rear of the connection component M16 or M20 for example 4 Thread all cables to be connected thro...

Страница 12: ...44 E1 E1 Contact water meter Factory provided 45 E2 Insufficient water switch E2 LSL 51 GND 52 24 V supply 53 0 10 V correcting variable 54 0 10 V feedback 55 GND Pressure relief valve control ball va...

Страница 13: ...on in the Maintenance certificate see chapter 10 5 Maintenance certificate on page 24 For the installation Place date Company Signature For the commissioning Place date Company Signature 7 Commissioni...

Страница 14: ...height 18 m run on temperature 70 C 158 F safety temperature 100 C 212 F Example calculation for suction pressure maintenance P0 pst pD 0 2 bar pst hst 10 pst 18 m 10 pst 1 8 bar pD 0 0 bar at a safet...

Страница 15: ...the VT vacuum spray pipe The venting screw at the PU pump 8 After successful conclusion of the vacuum test open the ball valve 2 9 If the controller displays the Insufficient water error message ackno...

Страница 16: ...ure relief valve WV1 Safe Control make up valve MKH3 Opening closing of tank spray pipe to the system The change in the filling level and the tank pressure are indicated on the display Note Manual ope...

Страница 17: ...ully calibrated 9 3 Modifying the controller s start routine Note For handling the operator panel see chapter 9 1 Operator panel on page 17 The start routine is used to set the required parameters for...

Страница 18: ...ccessfully completed you cannot commission the device In this case please contact Customer Service see chapter 12 1 Reflex Customer Service on page 25 9 Once null balancing has concluded successfully...

Страница 19: ...ress X to cancel your input without saving the new settings The controller automatically opens again the list 9 3 2 Service menu This menu is protected with a password It can be accessed only by the R...

Страница 20: ...24 hours The times for interval degassing are stored in the Service menu Daily start of interval degassing is at 8 00 a m Note Manual activation of the degassing program takes place in the customer me...

Страница 21: ...valve does not open Check set value in the Customer or Service menu Clean the dirt trap Check functioning of the PV1 solenoid valve If necessary manually add water 03 High water YES Set value exceeded...

Страница 22: ...and reset the maintenance counter upon completion Quit 24 Replace cartridge Set value for soft water capacity exceeded Replace cartridges Set soft water capacity Quit 25 Datalogger No SD card inserte...

Страница 23: ...ng the dirt trap on page 23 Annually Clean the dirt trap see chapter 9 3 1 Customer menu on page 18 Depending on the operating conditions Check the controller settings see chapter 9 3 3 Default settin...

Страница 24: ...13 Level sensor at the primary tank Preparation 1 Switch to Automatic mode 2 Close the cap valves upstream of the tanks and the EC expansion lines 3 Record the displayed filling level value in 4 Drain...

Страница 25: ...hot medium can cause burns Maintain a sufficient distance from the escaping medium Wear suitable personal protective equipment safety gloves and goggles CAUTION Risk of burns on hot surfaces Hot surf...

Страница 26: ...SI1870enC 9127065 01 21 Reflex Winkelmann GmbH Gersteinstra e 19 59227 Ahlen Germany 49 0 2382 7069 0 49 0 2382 7069 9546 www reflex winkelmann com...

Отзывы: