
REED
00 MODEL:
C50SS
TRAILER CONCRETE PUMP
MAINT
PAGE
48
•
Unscrew the valve protection cap #6 and valve seal hex cap #5. Exercise extreme care
not to damage the O-ring #7 when removing the cap.
•
Before making the installation of the gauge unit to the accumulator, turn the
“T”
handle
counterclockwise until some resistance is felt. Check that the manual bleed valve is
closed. It not close hand tight.
•
Install gauge unit on the accumulator by screwing the cap nut onto the gas valve. Hand
tighten.
•
Proceed to turn T-handle clockwise a maximum of 3 full turns from the full
counterclockwise position.
•
The gauge should then indicate the pre-charge pressure. Refer to specifications for
correct pressure:
•
If pressure reading is
TOO LOW
then accumulator will need
RECHARGED
.
•
If pressure is
TOO HIGH
then it will be necessary to
RELEASE
pressure.
RELEASE OF PRESSURE
When gauge indicates that the pre-charge pressure is too high proceed as follows to release
some of the pressure within bladder.
•
With gauging valve installed, carefully open the
MANUAL BLEED
valve, releasing
some of the nitrogen gas.
•
While doing this observe gauge until sufficient gas has been released and desired
pressure has been reached.
•
Close the manual bleed valve. Wait approximately 10 minutes for the pressure to
stabilize, then recheck and if necessary adjust accordingly.
•
To remove the gauging unit, turn
“T”
handle until resistance is felt to close the gas
valve. Open manual bleed valve.
•
Disconnect the gauging unit by unscrewing the cap from the gas valve. Replace valve
seal hex cap and tighten to 18 lb. ft. Screw on valve protection cap, hand tight.
REVISION:
Содержание 00 C50SS
Страница 12: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 11 REVISION...
Страница 29: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 28 MODEL C50SS REVISION...
Страница 36: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 06 REVISION...
Страница 37: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 07 LUBE POINT LOCATIONS REVISION...
Страница 50: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 20 REVISION...
Страница 55: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 25 REVISION...
Страница 59: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 29 REVISION...
Страница 60: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 30 REVISION S TUBE CIRCUIT HYD DIAGRAM...
Страница 63: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 33 REVISION...
Страница 66: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 36 REVISION...
Страница 67: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 37 REVISION...
Страница 72: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 42 REVISION...
Страница 76: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 46 REVISION...