
REED
00 MODEL:
C50SS
TRAILER CONCRETE PUMP
OPER.
PAGE
05
9. CONTROL SWITCH
This is a two (2) position toggle switch and is used to select the pump control
location. Move toggle to
LOCAL
to enable operation of concrete pump from main
stationary panel. Move toggle to
REMOTE
for operation using the remote control.
10. INDICATOR LIGHTS RELATED TO THE PUMP (GREEN LIGHT)
These green lights, located above and below the switches are used, when lit, to
indicate the position of the toggles.
11. HORN/RESET
This is a momentary toggle switch and is used to reactivate the control and pump
circuit after machine has been shut down using the
EMERGENCY STOP
switch.
Once the emergency stop has been depressed it will be necessary to pull out switch
and move toggle of
HORN
switch momentary to
RESET
position.
12. CONTROL ON INDICATOR (GREEN LIGHT)
This is a green indicator light, when lit denotes control circuit is energized.
13. STROKE CHANGE SWITCH
This switch is a two (2) position spring return switch and has two functions. One is
A momentary toggle to change stroke from one side to the other to help clear a
possible line plug. The other function is when the switch is held
DOWN
and allow
for end of stroke. High pressure check or in ths instance of equalizing the stroking
pistons. The allowance of the spring return sets the machine back in forward stroke.
14. VOLUME CONTROL (C-SERIES ONLY
CLOSED LOOP HYD SYSTEM)
This control is installed on the discharge port of the main hydraulic pump. It is used
to adjust volume
OUTPUT
of the material cylinders which in turn is controlled by the
hydraulic pump. Flipping toggle switch
UPWARD
will
INCREASE
volume, flipping
toggle switch
DOWNWARD
will
DECREASE
volume.
15. THROTTLE CONTROL-TOGGLE SWITCH
This is a three (3) position spring centered switch and is used to adjust the engine
RPM
. Toggle
UP
to
INCREASE
engine speed. Toggle
DOWN
to
DECREASE
engine speed. Speed of engine will retained as set until
RESET
.
16. STROKE COUNTER (OPTION-NOT SHOWN)
This digital indicator is used to indicate the amount of stokes per minute the concrete
pump is producing.
REVISION:
Содержание 00 C50SS
Страница 12: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 11 REVISION...
Страница 29: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 28 MODEL C50SS REVISION...
Страница 36: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 06 REVISION...
Страница 37: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 07 LUBE POINT LOCATIONS REVISION...
Страница 50: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 20 REVISION...
Страница 55: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 25 REVISION...
Страница 59: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 29 REVISION...
Страница 60: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 30 REVISION S TUBE CIRCUIT HYD DIAGRAM...
Страница 63: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 33 REVISION...
Страница 66: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 36 REVISION...
Страница 67: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 37 REVISION...
Страница 72: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 42 REVISION...
Страница 76: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 46 REVISION...