
REED
00 MODEL:
C50SS
TRAILER CONCRETE PUMP
MAINT
PAGE
00
PREVENTATIVE MAINTENANCE
How good is any of the equipment you own? It is only as good as it is
MAINTAINED
. Even
the finest equipment manufactured requires attention and care. The
00 MODEL C50SS
is
no different. A good well planned and carried out preventative maintenance program will
enhance a properly operating unit as well as the safety of those operating and using the
equipment.
It is very important to establish a good maintenance program. Costly repairs and loss of
revenue can often be avoided by planning ahead, setting a regular schedule and exercising
good preventative maintenance techniques.
The following section is offered as a guide and depicts a start for developing your own
preventative maintenance program for the
00 MODEL C50SS
concrete pump. The
program is depicted and broken into sections of
INSPECTION
and
LUBRICATION
.
All points noted herein regarding the maintenance
and checks are not intended to replace any local or
regional regulations which may pertain to this type of
equipment. It should also be noted that the list and
schedule is not considered to be inclusive. Interval
times may vary due to the climate and/or conditions
associated with the location area in which the
equipment will be used.
It is your responsibility to always insure that the
applicable safety precautions are strictly observed
when performing the inspections and maintenance
checks. Make certain any components that are found
to be defective are replaced or those in need of
adjustments or repair are corrected before operating
the machine.
REVISION:
Содержание 00 C50SS
Страница 12: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 11 REVISION...
Страница 29: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 28 MODEL C50SS REVISION...
Страница 36: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 06 REVISION...
Страница 37: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 07 LUBE POINT LOCATIONS REVISION...
Страница 50: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 20 REVISION...
Страница 55: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 25 REVISION...
Страница 59: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 29 REVISION...
Страница 60: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 30 REVISION S TUBE CIRCUIT HYD DIAGRAM...
Страница 63: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 33 REVISION...
Страница 66: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 36 REVISION...
Страница 67: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 37 REVISION...
Страница 72: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 42 REVISION...
Страница 76: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 46 REVISION...