7.4.1.
External thermostat ............................................................................................................ 42
7.5.
Installing the pellet conveyor auger ......................................................................................... 42
7.5.1.
Filling the pellet conveyor auger with fuel............................................................................. 42
7.6.
Connect the boiler control box to the power supply .................................................................. 42
7.7.
End view of the system ........................................................................................................... 43
8. CONTROL PANEL DISPLAY ....................................................................................................... 44
8.1.
Control panel logic .................................................................................................................. 44
9. MENU STRUCTURE ................................................................................................................... 45
9.1.
Hour/minutes adjustment ....................................................................................................... 46
9.2.
Settings Menu ........................................................................................................................ 46
9.2.1.
Language ........................................................................................................................... 46
9.2.2.
ECO mode .......................................................................................................................... 47
9.2.2.1.
Enabling/disabling ECO mode .............................................................................................. 47
9.2.3.
Back light ........................................................................................................................... 48
9.2.4.
Tone (Panel display: ON-OFF) ............................................................................................. 48
9.2.5.
°C/°F ................................................................................................................................. 48
9.2.6.
Recipe selection procedure .................................................................................................. 48
9.2.7.
Smoke Blower Offset ........................................................................................................... 48
9.2.8.
Puffer / EC Pump ................................................................................................................ 48
9.2.9.
Temperature On Pump ........................................................................................................ 49
9.2.10.
AUX Off .............................................................................................................................. 49
9.2.11.
Load Pellet (ON-OFF – only shown with the boiler off) .......................................................... 49
9.2.12.
Cleaning ............................................................................................................................. 49
9.2.13.
Start Pump ......................................................................................................................... 50
9.3.
Adjusting the water temperature in the boiler .......................................................................... 50
9.4.
Adjusting the maximum flame level ......................................................................................... 50
9.5.
First start-up .......................................................................................................................... 51
9.5.1.
Start-up/shutdown from the control panel ............................................................................ 51
9.5.2.
Note regarding first start-up ................................................................................................ 51
9.6.
Connecting the room thermostat or storage tank thermostat ..................................................... 52
10. SAFETY DEVICES .................................................................................................................... 53
10.1.
Alarm signals ......................................................................................................................... 54
10.2.
Silencing alarms ..................................................................................................................... 55
11. TROUBLESHOOTING .............................................................................................................. 56
12. CLEANING AND MAINTENANCE ............................................................................................. 58
12.1.
Instructions for inspection and maintenance ............................................................................ 58
12.2.
Body maintenance .................................................................................................................. 59
12.3.
Training and end user demonstration of maintenance and adjustment procedures ..................... 60
12.4.
Recommendations and obligations ........................................................................................... 63