77
15 - ELECTRICAL PLAN
Technical Dept. - All rights reserved - Reproduction is prohibited
MOTHERBOARD WIRING KEY
1.
FUSE
2.
BOARD PHASE
3.
BOARD NEUTRAL
4.
SMOKE EXTRACTOR FAN
5.
ROOM FAN
6.
PELLET SAFETY THERMOSTAT
7.
WATER TEMPERATURE OVERLOAD CUT-OUT
8.
SPARK PLUG
9.
CONNECT TO THE WATER PRESSURE SWITCH OF THE
HYDRAULIC KIT (OPTIONAL)
10. AIR PRESSURE SWITCH
11. AUXILIARY BOILER CONNECTION (TERMINAL)
12. AUGER
13. SMOKE TEMPERATURE PROBE
14. EXTERNAL THERMOSTAT CONNECTION (TERMINAL)
15. ROOM TEMPERATURE PROBE
16. PUFFER/BOILER PROBE CONNECTION (TERMINAL)
17. BOILER WATER TEMPERATURE PROBE
18. SMOKE EXTRACTOR FAN REVOLUTION CONTROL
19. BOILER FLOW SWITCH OR THERMOSTAT TO CONNECT TO THE
HYDRAULIC KIT (OPTIONAL)
20. 3-WAY VALVE PHASE (HEATING)
21. 3-WAY VALVE PHASE (DOMESTIC)
22. PUMP PHASE
23. PUMP NEUTRAL
24. 3-WAY VALVE NEUTRAL
25. CONTROL PANEL
PLEASE NOTE The electrical wiring of individual components is fitted with pre-wired connectors of different sizes.
Содержание COMPACT SLIM 15
Страница 1: ...INSTALLATION GUIDE GB Translation of original instructions PELLET BOILER COMPACT SLIM 15...
Страница 30: ...28 B C A 6 PANEL REMOVAL Upper top Lift top A remove and secure tops B and C Tops B and C are only supported...
Страница 38: ...36 n V r 7 HYDRAULIC CONNECTION FIGURE3 FIGURE4...
Страница 71: ...69 13 MAINTENANCE AND CLEANING Technical Dept All rights reserved Reproduction is prohibited Figure5 Figure4...