INSTALLATION INSTRUCTIONS
(continued)
21
SETUP WITH APPLIANCE MOUNTED FAN OR INLINE MOUNTED FAN
AND WALL TERMINAL
Maximum 13.5m flue length
Instructions are in 3 sections
- Intake pipe connection
- Flue exhaust connections
- Wall terminal setup
NOTE
– A MINIMUM OF 3 DEG. DRAINAGE FALL MUST BE INSTALLED IN THE POLY PRO
FLUE. DRAINAGE DIRECTION IS TOWARDS THE WALL TERMINAL AT THE END OF THE FLUE.