INSTALLATION INSTRUCTIONS
(continued)
12
Intake pipe joiner connection
Slide flue onto connection spigot fully.
Tighten clamp fully.
Wipe excess silicon, visually check connection to
ensure connection is fully sealed.
Ensure ends are burr free and round, test fit flue will
slide over connection joiner.
Apply an 8mm thick silicon
bead fully around both ends
of connector approx. 10mm
from the ends.