![Real Flame ELEMENT 1200 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/real-flame/element-1200/element-1200_installation-and-operation-manual_1425080039.webp)
39
Page
50. Check for correct pilot flame and good cross lighting.
51. Pilot flame should be easily travelling over the burner
channel.
52. Start appliance and adjust burner pressure to
correct pressure. – Note wait 3 minutes for burner to
automatically goto high setting. Pressures cannot be
accurately set prior to 3 minutes of operation.
Max Pressure adjustment nut
Minimum Pressure adjustment screw
53. Check appliance for correct flame operation
Flame should be even along the entire burner length.
Flame colour should have some blue with yellow
tipping. Flame should not be excessively yellow or
sooting on media. (Some minor buildup may occur
over long hours of use).
Note – appliance takes 15 – 20 minutes to achieve
full colour. Check flames are not smothered and
causing poor flame travel.
54. Remove manometer and tighten gas test point.
55. Check for gas leaks.
56. Turn appliance off
57. Refit door trim
58. Refit lower door trim angle.
59. Recheck operation.
60. Advise owner on correct operation of appliance
.
Note -
Good Flame Colour
Excessive color (high yellow / orange color and possible
sooting on media) – aeration caps require openings to
be increased. Check openings as per media table.
Poor flame color (weak color – very blue flame)- aeration
adjustment may requiring further closing or tighting of
aeration caps.
Содержание ELEMENT 1200
Страница 6: ...6 Page OPERATION INSTRUCTIONS...
Страница 17: ...17 Page IN STALL ATION INSTRUCTIONS...
Страница 41: ...41 Page APP EN DIX 1 FL UE TERMINATION...
Страница 42: ...42 Page APP EN DIX 2 WIRING DIAGRAMS 1200DS 1800DS...