background image

8

www.raytecled.com

UK / Europe Tel: +44 (0) 1670 520055

Americas Tel:  +1 613 270 9990

Declaration Of Conformity
With The Atex Directive 2014/34/EU
& UK Directive SI 2016 No. 1107 

(as amended)

Raytec Ltd. declares under our sole responsibility that the product(s) listed below 
conform with the relevant provisions of directive 2014/34/EU of 20

th

 April 2016 and 

UK Directive SI 2016 No. 1107 (as amended)

Manufacturer

Raytec Ltd 

Unit 15, Wansbeck Business Park

 

Rotary Parkway

 

Ashington 

Northumberland 

NE63 8QW

 

United Kingdom

 

 

Description

of Equipment

 

 

Spartan range of Mid Power Floodlights

Certification 

 

Body

CML

 

New Port Road 

Ellesmere Port

 

CH65 4LZ

 

Certificate

numbers 

CML21ATEX3317 or IEC Ex CML21.0037 or CML21UKEX3319  

CML21ATEX3320 or IEC Ex CML21.0038 or CML21UKEX3321  

ATEX Quality Assurance Notification CSA BV (2813)  

 

UKCA Quality Assurance Notification CSA UK (0518)

Equipment

Marking 

II 2 GD Ex eb mb IIC T4 Gb

Ta -40°C to +60°C

Ex tb IIIC T90°C Db

Ta -40°C to +60°C

IP66/IP67 110-277V AC

II 3 GD Ex ec mc IIC T4 Gc

Ta -40°C to +60°C

Ex tc IIIC T90°C Dc 

Ta -40°C to +60°C

IP66/IP67 110-277V AC

Содержание SPARTAN MP Series

Страница 1: ...tallation 3 Maintenance 4 Technical Specification 5 Trouble Shooting The SPARTAN MP series of explosion protected floodlights highbay are specialist devices certified for use in specific operating env...

Страница 2: ...he environment the SPARTAN unit will be installed in Zone 1 and Zone 2 Hazardous areas 5 Check certification nameplate on front of floodlight to ascertain type of threaded cable entry on the luminaire...

Страница 3: ...ing points must be used the fixing points must be suitable for the conditions of use 2 The line diagrams below are for guidance only units may be mounted in any orientation Mounting MP SPARTAN Unit Fl...

Страница 4: ...4 www raytecled com UK Europe Tel 44 0 1670 520055 Americas Tel 1 613 270 9990 Mounting SPARTAN Unit Highbay Application 55 39 28 1 3 361 386 350...

Страница 5: ...ly 9 Ensure no cables are trapped and gasket is seated correctly and replace terminal cover tighten to 4Nm 10 If carrying out Insulation Resistance tests the normal method of insulation testing is to...

Страница 6: ...remove the terminal enclosure cover to get access to the power supply Remove the power supply from the mains terminals then remove LED wires white and white with red mark 5 Disposal of packaging SPAR...

Страница 7: ...r Factor 230Vac full load 0 97 Mains Frequency 50 60Hz Inrush Current Ipeak 50 53A t 300 s Total Harmonic Distortion 230Vac full load 10 IP Rating IP66 67 Weight std 13 2Kg 13 2Kg Dimensions See previ...

Страница 8: ...Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Description of Equipment Spartan range of Mid Power Floodlights Certification Body CML New Port Road Ellesmere Port CH65 4LZ Certi...

Страница 9: ...and Safety Requirements has been assessed by reference to the following harmonised designated standards EN 60079 0 2018 EN60079 7 2015 A1 2018 EN 60079 18 2015 A1 2017 EN60079 31 2014 And also 2014 35...

Страница 10: ...com Raytec Ltd Unit 15 Wansbeck Business Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Tel 1 613 270 9990 sales raytecled com Raytec Systems Inc 800 300 Terry Fox Drive Ottawa...

Отзывы: