background image

SPARTAN

Mid Power Luminaire Range - 
Installation Guide 

SPX/SPZ

Zone 1 and 21 Variant CML21ATEX3317 & IEC Ex CML21.0037 or CML21UKEX3319   
Zone 2 and 22 Variant CML21ATEX3320 & IEC Ex CML21.0038 or CML21UKEX3321

This installation guide provides instructions for installing the SPARTAN MP Highbay/ 

Floodlight series of explosion protected floodlights.

Overview 

1

 

Safety Instructions 

2

 Installation 

3

 Maintenance 

4

 

Technical Specification

 

5

 

Trouble Shooting

The SPARTAN MP series of explosion protected floodlights/highbay are specialist devices,  

certified for use in specific operating environments.

The units must be installed in accordance with these instructions, must be correctly certified  

for the specific operating environment and must be installed by suitably qualified personnel.

If you have any queries about the installation or the certification of the unit – please contact  

Raytec for immediate assistance and advice.

Important information

1250-D

-00005 Rev 1

Содержание SPARTAN MP Series

Страница 1: ...tallation 3 Maintenance 4 Technical Specification 5 Trouble Shooting The SPARTAN MP series of explosion protected floodlights highbay are specialist devices certified for use in specific operating env...

Страница 2: ...he environment the SPARTAN unit will be installed in Zone 1 and Zone 2 Hazardous areas 5 Check certification nameplate on front of floodlight to ascertain type of threaded cable entry on the luminaire...

Страница 3: ...ing points must be used the fixing points must be suitable for the conditions of use 2 The line diagrams below are for guidance only units may be mounted in any orientation Mounting MP SPARTAN Unit Fl...

Страница 4: ...4 www raytecled com UK Europe Tel 44 0 1670 520055 Americas Tel 1 613 270 9990 Mounting SPARTAN Unit Highbay Application 55 39 28 1 3 361 386 350...

Страница 5: ...ly 9 Ensure no cables are trapped and gasket is seated correctly and replace terminal cover tighten to 4Nm 10 If carrying out Insulation Resistance tests the normal method of insulation testing is to...

Страница 6: ...remove the terminal enclosure cover to get access to the power supply Remove the power supply from the mains terminals then remove LED wires white and white with red mark 5 Disposal of packaging SPAR...

Страница 7: ...r Factor 230Vac full load 0 97 Mains Frequency 50 60Hz Inrush Current Ipeak 50 53A t 300 s Total Harmonic Distortion 230Vac full load 10 IP Rating IP66 67 Weight std 13 2Kg 13 2Kg Dimensions See previ...

Страница 8: ...Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Description of Equipment Spartan range of Mid Power Floodlights Certification Body CML New Port Road Ellesmere Port CH65 4LZ Certi...

Страница 9: ...and Safety Requirements has been assessed by reference to the following harmonised designated standards EN 60079 0 2018 EN60079 7 2015 A1 2018 EN 60079 18 2015 A1 2017 EN60079 31 2014 And also 2014 35...

Страница 10: ...com Raytec Ltd Unit 15 Wansbeck Business Park Rotary Parkway Ashington Northumberland NE63 8QW United Kingdom Tel 1 613 270 9990 sales raytecled com Raytec Systems Inc 800 300 Terry Fox Drive Ottawa...

Отзывы: