Raytec Americas:
+1 613 270 9990 • [email protected]
Raytec Ltd reserve the right to change specifications without prior notification or public announcement.
Version 1
www.raytecled.com
1277-D
-0002
Installation Steps
Secondary Safety Kit (Ordered Separately)
Step 1.
Step 2.
Step 3.
Step 4.
This SPX-BKT-AR-SK-## kit is intended for use with UL Listed AR luminaire as marked on the luminaire nameplate.
Accessory Package Contents
Remove the bottom-left pre-installed M6 x 16mm Hex Cap Screw.
Install bracket on AR luminaire as shown using supplied M6 x 20mm Hex Cap Screw.
Torque M6 x 20mm Hex Cap Screw to 40 in-lbs (4.5 Nm). It is strongly recommended
that a medium or high strength thread-locker be used when installing the bracket. For
units using surface or suspension mounting, install safety kit hardware on top of the
surface mount or suspension mount brackets in the same location as shown.
- Attach loose end of stainless steel chain to fixed eye-bolt (not supplied) using
the second stainless steel oval shaped threaded connecting link.
- Alternate attachment method: Wrap loose end of chain around fixed beam or
other immovable support and create a closed loop using the second stainless
steel oval shaped threaded connecting link. Supporting beam or structure must
form a closed loop to prevent the secondary safety chain from slipping off or
becoming unhooked.
Attach stainless steel chain to safety kit bracket using stainless steel oval
shaped threaded connecting link.
Attach loose end of chain. Secondary safety mounting point must be suitable for
supporting a minimum of 120lbs:
SPX-BKT-AR-SK-##
QTY
PART NAME
1
1003-01-02-301 (ZLM Secondary Safety)
1
M6 Flat Washer
1
M6 x 20mm Hex Cap Screw
2
Oval Shaped Threaded Connecting Link
1
Stainless Steel Chain, 1/8” Trade Size
Step 1
Step 2
SPI-AR
M6 SCREW
1
2
3