MAINTENANCE
Suggested Minimum
Maintenance Schedule
Regular service by a qualified service agency and
maintenance must be performed to ensure maximum
operating efficiency.
Maintenance as outlined below may be performed by
the owner.
Daily
1.
Check that the area where the heater is installed
is free from combustible materials, gasoline, and
other flammable vapors and liquids.
2.
Check for and remove any obstruction to the flow
of combustion or ventilation air to heater.
Monthly
1.
Check for piping leaks around circulators, mixing
valves, relief valves, and other fittings. If found,
repair at once. DO NOT use petroleum-based
stop-leak compounds.
2.
Visually inspect burner flame.
3.
Visually inspect venting system for proper func-
tion, deterioration or leakage.
4.
Check air vents for leakage.
Yearly (Beginning Of Each Heating
Season)
Schedule annual service call by qualified service
agency.
1.
Visually check top of vent for soot. Call service
person to clean. Some sediment at bottom of vent
is normal.
2.
Visually inspect venting system for proper func-
tion, deterioration or leakage.
3.
Check that area is free from combustible materi-
als, gasoline, and other flammable vapors and
liquids.
4.
Check for and remove any obstruction to the flow
of combustion or ventilation air to heater.
5.
Follow pre-start-up check in the Start-up section.
6.
Visually inspect burner flame. It should be light
blue. Remove and visually inspect hot surface ig-
niter and sensor for damage, cracking or debris
build-up.
7.
Check operation of safety devices. Refer to manu-
facturers’ instructions.
8.
Follow oil-lubricating instructions on circulator if
required. Over-oiling will damage circulator.
Water-lubricated circulators do not need oiling.
9.
To avoid potential of severe burn, DO NOT REST
HANDS ON OR GRASP PIPES. Use a light touch;
return piping will heat up quickly.
10. Check blower and blower motor.
11. Check for piping leaks around circulators, relief
valves and other fittings. Repair, if found. DO NOT
use petroleum-based stop-leak.
12. Clean air filter.
Periodically
1.
Check relief valve. Refer to manufacturer’s in-
structions on valve.
2.
Test low water cut-off, if used. Refer to manufac-
turer’s instructions.
3.
Clean screen and air filter in intake.
Preventive Maintenance
Schedule
The following is required procedure in CSD-1 states
and good practice for all Delta Limited installations.
Daily
1.
Check gauges, monitors and indicators.
2.
Check instrument and equipment settings. (See
“Post Start-Up Check” on page 44.)
3.
Check burner flame. (Should see light blue flame).
47
Содержание 399B-2339B
Страница 23: ...23 Fig 20 2 Stage Wiring Connections Fig 21 3 Stage Wiring Connections Fig 22 4 Stage Wiring Connection...
Страница 39: ...Wiring Diagram Models 399B 1259B 39...
Страница 40: ...Wiring Diagram Models 1529B 2339B 40...
Страница 52: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...