WARNINGS
4
BEFORE INSTALLATION
5
Product Receipt
5
Model Identification
5
Ratings and Certifications
5
Installations at Elevation
5
Component Locations
6
General Information
7
GENERAL SAFETY
8
Time/Temperature Relationships in
Scalds
8
INSTALLATION
9
Installation Codes
9
Equipment Base
9
Stacking
9
Clearances
11
Combustion and Ventilation Air
12
Conventional Combustion Air Supply
12
Water Piping
14
Hydronic Heating
16
Gas Supply
18
Electrical Power Connections
21
Field Wiring Connection
22
Venting
25
Changing the Flue Outlet
27
Venting Installation Tips
27
Venting Configurations
28
Outdoor Installation
32
Controls
32
Heater Sequence of Operation
33
Wiring Diagrams
39
START-UP
41
Pre Start-up
41
Start-Up
42
OPERATION
45
Lighting Instructions
45
To Turn Off Gas To Appliance
45
TROUBLESHOOTING
46
MAINTENANCE
47
Suggested Minimum
Maintenance Schedule
47
Preventative Maintenance Schedule
47
APPENDIX
49
Inside Air Contamination
49
WARRANTY
50
START-UP CHECKLIST
51
CONTENTS
3
Содержание 399B-2339B
Страница 23: ...23 Fig 20 2 Stage Wiring Connections Fig 21 3 Stage Wiring Connections Fig 22 4 Stage Wiring Connection...
Страница 39: ...Wiring Diagram Models 399B 1259B 39...
Страница 40: ...Wiring Diagram Models 1529B 2339B 40...
Страница 52: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...