Contents
Chapter 1 Important information............................. 7
Safety notices................................................................. 7
TFT LCD Displays .......................................................... 8
Water ingress ................................................................. 8
Disclaimers .................................................................... 8
EMC installation guidelines ............................................. 9
Suppression ferrites ........................................................ 9
Connections to other equipment ...................................... 9
Declaration of conformity................................................. 9
Product disposal ............................................................. 10
Warranty registration....................................................... 10
IMO and SOLAS............................................................. 10
Technical accuracy ......................................................... 10
Chapter 2 Planning the installation ........................ 11
2.1 Handbook information ............................................... 12
2.2 Installation checklist .................................................. 12
2.3 Pilot system .............................................................. 13
2.4 System protocols ...................................................... 17
2.5 Pack contents ........................................................... 18
2.6 Tools ........................................................................ 19
Chapter 3 Cables and connections......................... 21
3.1 General cabling guidance .......................................... 22
3.2 Connections overview ............................................... 23
3.3 SeaTalk
ng
connection ................................................ 24
3.4 NMEA2000 connection .............................................. 26
3.5 SeaTalk connection ................................................... 26
Chapter 4 Location and mounting .......................... 29
4.1 Site Requirements..................................................... 30
4.2 Selecting a location ................................................... 31
4.3 Mounting .................................................................. 32
Chapter 5 System checks ........................................ 35
5.1 Commissioning pre-requisites .................................... 36
5.2 Commissioning process............................................. 36
5.3 Initial power on test ................................................... 37
5.4 Using the set up wizard ............................................. 39
5.5 Dockside calibration .................................................. 40
5.6 Dealer settings.......................................................... 42
5.7 Seatrial calibration..................................................... 42
5.8 Checking autopilot operation...................................... 45
Chapter 6 Adjust settings ........................................ 47
6.1 Vessel Settings ......................................................... 48
6.2 Drive settings............................................................ 49
6.3 Sailboat settings ....................................................... 53
6.4 User Settings ............................................................ 54
5
Содержание P70
Страница 2: ......
Страница 4: ......
Страница 20: ...20 p70 p70r Pilot controller Installation instructions...
Страница 28: ...28 p70 p70r Pilot controller Installation instructions...
Страница 68: ...68 p70 p70r Pilot controller Installation instructions...
Страница 77: ...Owner notes...
Страница 78: ...Owner notes...
Страница 79: ......
Страница 80: ...www raymarine com...