G-Series Installation & Commissioning
74
7.1
Power up the system
Before powering up
Before proceeding with the power on test of your system please
ensure that:
•
Radar and all ancillary equipment has been installed and con-
nected in accordance with the manufacturers instructions.
•
All G-Series equipment has been installed and connected in ac-
cordance with the G-Series installation instructions.
Turn on breakers
Turn on the power to the equipment at the distribution panel.
1. Monitors and ancillary equipment
2. GPM400 processors.
Power up sequence
Power up the monitors first to allow the boot sequence and start-up
information to be shown at master monitors.
See also
For information on repeat / master monitors see
page 38
.
7.2
First time configuration
There is an automatic menu sequence when you set up the system
for the very first time (i.e. for systems which do not yet have any
Nav Stations configured). This will automatically display the appro-
priate menus at power up, to help you to configure your Nav
Stations.
Note:
First time configuration must be done at a monitor
connected to the master GPM (see
page 75
).
Nav Station
A Nav Station is a group of monitors, GPM processors and Key-
boards. This provides a location from where users can view and
control the G-Series system.
First time configuration, automatic sequence
Select Master GPM
•
To set the Master GPM on page 76
Create Nav Station
•
To create a new Nav Station on page 77
•
To assign monitors to a Nav Station on page 77
Assign Keyboards
•
Assign Keyboards on page 78
Appropriate set-up menus will automatically appear on the monitor.
Содержание G-Series system
Страница 1: ...G Series Systems Installation and Commissioning Instructions...
Страница 2: ......
Страница 3: ...G Series System Installation Commissioning Instructions Document Number 87070_1 Date June 2007...
Страница 6: ...G Series Installation Commissioning 6...
Страница 10: ...G Series Installation Commissioning 10...
Страница 14: ...G Series Installation Commissioning 14...
Страница 29: ...29 Chapter 3 Packs and contents 3 7 Alarm buzzer Pack items Description Part No Alarm buzzer E26033 D10363 1...
Страница 30: ...G Series Installation Commissioning 30...
Страница 56: ...G Series Installation Commissioning 56...
Страница 68: ...G Series Installation Commissioning 68...
Страница 72: ...G Series Installation Commissioning 72...
Страница 80: ...G Series Installation Commissioning 80...
Страница 102: ...G Series Installation Commissioning 102...
Страница 108: ...G Series Installation Commissioning 108...
Страница 120: ...G Series Installation Commissioning 120...
Страница 126: ...G Series Installation Commissioning 126...
Страница 127: ......