background image

55M4000BCE00  REV A 

26 

 
2)

 

Accurately measure the actual radius of the hook block from the centre line of slew 
of the machine. 

3)

 

Use 

 or 

” 

to adjust the Corr.: 

x.x

 value until the displayed radius equals the 

measured radius, note that the indicated radius can only be increased, not 
decreased.  Press 

 to accept the change, the system will confirm the calibration 

is saved. 

4)

 

The display will show the current boom length and an another target boom length 
for calibration. With the hook block suspended, telescope the boom in to the target 
length specified on the display, this is normally the half extension available,   be sure 
to check that the hook block does not foul the boom tip and that the boom is at a 
high enough angle to safely permit the half extension.  

5)

 

Accurately measure the actual radius of the hook block from the centre line of slew 
of the machine. 

6)

 

Use 

 or 

” 

to adjust the Corr.: 

x.x

 value until the displayed radius equals the 

measured radius, note that the indicated radius can only be increased, not 
decreased.  Press 

 to accept the change, the system will saved the value and 

return to the Main Calibration Menu 

 

3.6  Step #14:  “Loaded boom deflection” 

 
This procedure is used to add an allowance into the calculation of the hook radius to 
compensate for main boom and/or chassis deflection due to a suspended load. 
This procedure should only be used with machine configurations on outriggers or on 
crawlers. 
A known test weight is required to carry out this calibration, the weight should be 
between 50% and 90% of the SWL for the configuration being calibrated and should be 
based on the SWL with a fully extended boom at approximately 60° boom angle.  The 
calculated test load should normally include the weight of the hook block and any slings, 
shackles etc. that are used. 
   

1)

 

Use 

 or 

” 

to highlight “Loaded boom deflection” and press 

 to enter.   

The display will show the current boom length and a target boom length for calibration.   
 

 

Содержание i4000

Страница 1: ...tem Drury Lane 1020 9 th Avenue SW 2440 Ave Dalton St Leonards on Sea Suite 124 Ste Foy East Sussex Bessemer AL 35022 Qu bec G1P 3X1 England U S A Canada TN38 9BA Tel 44 0 1424 421235 Tel 1 205 481 20...

Страница 2: ...55M4000BCE00 REV A 2...

Страница 3: ...on and or modification of the equipment are strictly forbidden without written approval from RaycoWylie Systems The i4000 RaycoWylie Systems Multi Purpose Indicator MPI is to be regarded only as an ai...

Страница 4: ...manual and the crane manufacturer operator s manual He must also be aware of all the federal state and local safety standard and regulations applicable to his job Correct functioning of the system dep...

Страница 5: ...sions Data entry 12 2 7 Step 7 system options setting 15 2 8 Step 8 Internal Relay Set Up 16 3 CALIBRATION 17 3 1 Step 9 Zero sensor Side of boom angle angle sensor calibration 17 3 2 Step 10 Zero sen...

Страница 6: ...rformed by a qualified technician Furthermore calibration of the i4000 system must be performed by a RaycoWylie trained technician The RaycoWylie technician will perform a complete and structured veri...

Страница 7: ...ll left through the tabs of the main menu or in Edit mode to return to the previous digit of a configurable value Right Key Press this key to scroll right through the tabs of the main menu or in Edit...

Страница 8: ...RANGE LIMITING TAB TOOLS TAB 2 1 Step 1 Accessing the calibration menu 1 Select the tool tab using the left or right keys 2 Scroll to highlight Calibration Mode using or 3 Press to enter this menu 4...

Страница 9: ...oll to select the sensor option to edit 4 Press to highlight the value to edit Scroll up or down to change to value then Press to confirm 5 Any change made is permanently registered after confirmation...

Страница 10: ...ey at any time to exit the menu when done Rope Limit Main This is the maximum tension that the cable is rated for per fall or part of line rope SWL for the main rope Rope Limit Aux This is the maximum...

Страница 11: ...ill be activated and the yellow display LED will blink App Length This variable represents an approach warning gap before to reach the boom length limit set by the operator in the normal mode If the b...

Страница 12: ...m with all sections fully extended including any manual or power pinned extension if fitted CL2MR Ext Man length of the boom fully extended but with any manual or power pinned extension retracted Note...

Страница 13: ...the centreline of slew is generally in front of the boom pivot pin in which case cf is negative If any other dimension falls the opposite side of it s datum line shown in the diagrams then it s sign...

Страница 14: ...55M4000BCE00 REV A 14 Rooster sheave geometry Fly jib geometry...

Страница 15: ...is enable the following 3 features will be displayed Save limit Optional feature if enabled then setting this to ON will display a message on start up indicating a limit is saved if a limit has previ...

Страница 16: ...16 2 8 Step 8 Internal Relay Set Up This item allows the selection of which option the internal relay will be activated There is three options which are available Absolute limiter Overload and Range...

Страница 17: ...switch setting for each angle sensor interface Angle Sensor Side of Boom 1 Use or to choose Sensor Calibration and press 2 Use or to choose the Select Sensor and press the Use or again to choose the...

Страница 18: ...the sensor to increase the value 3 Press to edit the angle value using or 4 Press again to confirm the zero 5 Press Escape to return to the main calibration menu The boom angle need not be zero but it...

Страница 19: ...libration 1 Use or to choose span and press 2 Fully extend all the boom sections up to and including the section that the length sensor cable is attached to for single reel installations this is all b...

Страница 20: ...ust be done with two accurately known test loads a small load and a large load The large calibration load should provide between 50 90 line pull on the hoist line while using as many parts of line as...

Страница 21: ...ue of the suspended test load then press to confirm the value Note the indicated value will return to its earlier state temporarily the new zero value will be stored after the next step 4 Press Escape...

Страница 22: ...closest possible setting refer to the label inside the interface unit for guidance The standard gain setting number is 325 other options are 219 253 413 579 and 630 a higher gain setting will result i...

Страница 23: ...te encoder is fitted as the slew sensor If a relative encoder as 33M0118 is installed and selected you don t need to do the zero To set the zero datum Rotate the machine to the zero datum point normal...

Страница 24: ...f bits for single 360 rotation of the crane only if you have selected a multi turn encoder as 33S0047 otherwise the value stays at zero 4 Press Escape to return to the main calibration menu Inverse Ro...

Страница 25: ...ss to enter The display will show the current boom length and a target boom length for calibration With the hook block suspended telescope the boom out to the target length specified on the display th...

Страница 26: ...or to adjust the Corr x x value until the displayed radius equals the measured radius note that the indicated radius can only be increased not decreased Press to accept the change the system will save...

Страница 27: ...om angle for calibration normally 60 Adjust the boom angle to the target angle when the boom is at the correct angle for calibration the display will change to show Carefully lift the test load until...

Страница 28: ...fer and press to enter 2 Select Calibration to USB and press a copy of the calibration information will be created in a file called cranename_000000 cal located in the root folder of the USB memory st...

Страница 29: ...tor USB of the i4000 display unit using a Deutsch to USB converter lead RaycoWylie part no 33V0338 before proceeding Ensure the file required to be restored is saved in the root folder of the USB stic...

Страница 30: ...ing this option if in doubt don t Init all memory Select this option to re initialize the system memory a warning screen will be displayed to ask for confirmation if confirmed all calibration data wil...

Страница 31: ...t hand side of this screen represent a count of the number of individual faults detected for each component and can be useful in tracing system faults Navigate through the calibration menu using or to...

Отзывы: