RG25DH Operation • Service • Maintenance • Parts Manual
24
Operation
Transporting the Machine
For highway travel a Rayco trailer is available. There are legal
road requirements for towing equipment and trailers (such as
lighting and licensing). It is the owner/operator’s responsibility
to be aware of these laws and adhere to them.
Checklist for Transporting Machine
1. Install the transport lock bar.
2. Check all pins to make sure they are secure.
3. Check attachment to the towing vehicle for security.
4. Check that the ball on the towing vehicle is the same size
as the coupler (2 inches). The coupler may be adjusted
by loosening or tightening the nut on the underside.
5. Install the safety chains.
6. Check tire pressure, tire condition and that the lug bolts
are tight before each towing.
Starting with Jumper Cables
1. On the stalled machine, turn the start switch OFF.
2. Move the boost machine near enough to the stalled
machine for cables to reach, but DO NOT ALLOW THE
MACHINES TO TOUCH.
3. Stop the engine on the boost machine.
4. Open the battery covers of both machines to purge
flammable fumes.
5. Remove all of the battery caps from the batteries (if not
maintenance-free type) on both machines, allowing
explosive vapors to disperse.
6. 6.Connect jumper cables:
(1) Connect the red positive (+) jumper cable to the
positive (+) terminal of battery of the stalled machine,
where the battery red positive (+) cable is already
connected. (Pull back rubber boot to gain access.)
(2) Connect the other end of the red positive (+) jumper
cable to the positive (+) terminal of the battery of the
boost machine.
(3) Connect the black negative (-) jumper cable to the
negative (-) terminal of the boost machine battery.
(4) Connect the other end of the black negative (-) jumper
cable to the negative post of the stalled machine, where
the battery black negative (-) cable is already connected.
7. Start the engine on the boost machine and allow it to
run at high idling speed for about ten minutes. This will
partially charge the stalled engine’s battery.
8. Start the stalled engine.
9. Immediately after starting the stalled engine, disconnect
the jumper cables, in reverse order.
10. Reinstall the battery caps and battery covers.
11. After completion of the above procedure, perform failure
analysis on the starting/charging system of the stalled
machine as required.
THE HANDLE TRANSPORT BAR MUST BE IN PLACE
WHEN TRANSPORTING THE MACHINE OR SEVERE
DAMAGE TO THE HANDLEBAR ASSEMBLY MAY
OCCUR.
DO NOT ALLOW THE JUMPER CABLE CLAMP
TO TOUCH THE OTHER SOLENOID TERMINAL.
UNCONTROLLED STARTING OF THE ENGINE
WOULD OCCUR, WHICH COULD CAUSE SEVERE
INJURY OR DEATH.
Содержание RG25HD
Страница 48: ...RG25DH Operation Service Maintenance Parts Manual 48 Troubleshooting ...
Страница 49: ...RG25DH Operation Service Maintenance Parts Manual 800 392 2686 49 Troubleshooting ...
Страница 50: ...RG25DH Operation Service Maintenance Parts Manual 50 Troubleshooting ...
Страница 51: ...RG25DH Operation Service Maintenance Parts Manual 800 392 2686 51 Troubleshooting ...
Страница 52: ...RG25DH Operation Service Maintenance Parts Manual 52 Troubleshooting ...
Страница 53: ...RG25DH Operation Service Maintenance Parts Manual 800 392 2686 53 Troubleshooting ...
Страница 54: ...RG25DH Operation Service Maintenance Parts Manual 54 Troubleshooting ...
Страница 55: ...RG25DH Operation Service Maintenance Parts Manual 800 392 2686 55 Troubleshooting ...
Страница 56: ...RG25DH Operation Service Maintenance Parts Manual 56 Troubleshooting ...
Страница 57: ...RG25DH Operation Service Maintenance Parts Manual 800 392 2686 57 Troubleshooting ...
Страница 59: ...RG25DH Operation Service Maintenance Parts Manual 800 392 2686 59 RG25HD Full Assembly Rev 3 8 ...
Страница 66: ...RG25DH Operation Service Maintenance Parts Manual 66 Hydraulic Drive Assembly ...