SEE FIGS. 9, 10 & 11
It is recommended that each side of the burner is serviced
individually so as not to get the components from the two
burners mixed up.
The correct combination of burner blast tubes are shown.
To remove blast tube, slacken two grub screws, pull
forward.
COOKER/BOILER = Countersunk screws in tube
COOKER
BURNER
11
INTRODUCTION
Burner Servicing
Fig. 10
10 VANES
Fig. 9
COOKER/BOILER BURNER
BOILER
BURNER
Fig. 11
4 VANES
DESN 515977
DESN 515963
Содержание 680KCD C
Страница 9: ...Cleaning 9 Fig 6 ALL BAFFLES MUST BE STACKED IN PLACE AS DIAGRAM ABOVE ...
Страница 22: ...22 Fig 31 DESN 514774 Replacement of parts Electrical controls ...
Страница 23: ...23 Fault Finding Fig 32 Rayburn 600 700 Wiring Diagram 111MB for Individual Satronic boxes ...
Страница 29: ...Fault Finding 29 Fig 34A DESN 516838 ...
Страница 30: ...30 Fault Finding ...
Страница 31: ...31 Fault Finding ...
Страница 33: ...33 ...
Страница 34: ...34 ...
Страница 35: ...35 ...