P/N 42-9472 Copyright 2008 Mestek, Inc.

Cast iron condensing boiler

 

Cast iron condensing boiler

 — Control manual

Troubleshooting

5

Table 9

 

Accessing and using the Log

Enter Setup:  From STANDBY, hold 

 for 5 seconds. Then press 

 until the cursor points to VIEW LOG.

Press 

 with the cursor on VIEW LOG.

The screen will now show the most recent entry in the log.

Use the arrow keys to scroll through the log entries (entry number and date are on the fi rst line of the log screen).

Each log entry includes three screens as described below. The top line remains the same in all three, and contains the date stamp 

and entry number.

An entry is made each time a change in demand occurs, or when demand changes from heating to DHW or back, each prepurge 

and postpurge occurrence, and each ignition sequence. An entry is also made when any of the Screen 3 events (below) occurs. 

These events may be errors, faults or notifi cation of setback activity.

Содержание 200i

Страница 1: ...ed with a dust freeairsupply Followtheinstructionmanualprocedurestoductairtotheboilerairintake Iftheboilerhasbeencontaminatedbyoperation with contaminated air follow the instruction manual guidelines...

Страница 2: ...nput from an external controller The control method used by the SmartCycle control is based on digital communications which elimi nates the need for analog control signals Analog signalinputs are supp...

Страница 3: ...ernal high limit and or low water cutoff if desired To flow switch when used Used to activate combustion air damper if desired To combustion air damper proving switch required when controlling combust...

Страница 4: ...4 P N 42 9472 Copyright 2008 Mestek Inc Cast iron condensing boiler Cast iron condensing boiler Control manual The Mestek 200iboiler with SmartCycleTM control...

Страница 5: ...Each boiler requires the RS485 interface board and cable Boiler setup is essentially the same as for method 1 with the exception that each boiler must be assigned both a SmartCycle network address and...

Страница 6: ...inFigure2 Install a fused service switch mounted and installed in accordance with all appli cable codes 1 2 3 4 5 6 7 8 9 10 1 1 2 3 Figure 1 Electrical connection board see item 10 page 3 for locatio...

Страница 7: ...potential damage from heat pocket ing in the top of the heat exchanger Thepostpurgecirculatorisfactory pipedandpre wired Do not change the usage the wiring the location or the piping Boiler circulato...

Страница 8: ...ard If there is more than one transformer provide one wire from each transformer common side to one of the IAR negative terminals IAR Sensor wiring Header sensor is required A header sensor must be in...

Страница 9: ...8 Mestek Inc Cast iron condensing boiler Cast iron condensing boiler Control manual Figure 7 200i wiring summary wiring to electrical connection board Method 1 SmartCycle modulation local control cont...

Страница 10: ...sing boiler Cast iron condensing boiler Control manual Figure 8 200i wiring summary wiring to electrical connection board continued see Figure 7 page 9 for terminal strip locations Also see Figure 5 p...

Страница 11: ...trol system water temperature if member boilers were to input heat to the system without control from the master DHW operation in particular would raise the supply temperature from overriding boilers...

Страница 12: ...s Carefully read the parameter explanations in Table 8 page 25 through page 29 When adjusting the limit band operating limit OP LIMIT local setpoint LOC SETPOINT and DHW setpoint make sure the operati...

Страница 13: ...C 13 D 14 E and 15 F If the display shows a blank space such as 123_56789ABC the control does not detectthemissingboiler boiler4 ChecktheyellowLEDonthecommunication port of the missing boiler NORMAL c...

Страница 14: ...r 15 MainValve 31 Present Boiler Detected Overview This method uses an RS485 digital communications cable with the Modbus protocol to control a boiler or SmartCycle network Theboilerorboilernetworkwil...

Страница 15: ...of seconds that the boiler has been running For instance Register 29 65536 Register 30 Boiler 1 runtime in seconds Boiler 1 is the master boiler Boilers 2 16 are member boilers 0 4294967295 seconds BA...

Страница 16: ...connection as shown in Fig ure 12 Install a fused service switch mounted and installed in accordance with all appli cable codes 1 2 3 4 5 6 7 8 9 1 1 2 3 Figure 11 Electrical connection board see item...

Страница 17: ...ntial damage from heat pocketing in the top of the heat exchanger Thepostpurgecirculatorisfactory pipedandpre wired Do not change the usage the wiring the location or the piping Boiler circulator See...

Страница 18: ...ach boiler requires a return water temperature sensor DHW wiring ONLY if using DHW override mode The boiler or boilers must be piped with isolation valves and wired for override operation Override of...

Страница 19: ...72 Copyright 2008 Mestek Inc Cast iron condensing boiler Cast iron condensing boiler Control manual Method 3 External 4 20ma control continued 3 Figure 16 200i wiring summary wiring to electrical conn...

Страница 20: ...ast iron condensing boiler Cast iron condensing boiler Control manual Method 3 External 4 20ma control continued 3 Figure 17 200i wiring summary wiring to electrical connection board continued see Fig...

Страница 21: ...erminals This will prevent the boiler for attempting to cycle during the setup process See Control menus and adjustments beginning on page 22 for a complete list of control parameters and explanations...

Страница 22: ...e of the display as shown providing information on various setpoints and parameters The display LOC SET means the setpoint temperature Figure 18 shows the fac tory default values Accessing setup menus...

Страница 23: ...P 20 F LO IAR 40 VIEW IARVALUES Display only not changeable here shows values for 8 zones 70 70 70 70 70 70 70 70 OUTDOOR AIR OA SHUTDOWN OFF ON or OFF OA SHUTDOWN OFF OA SETPT 68 F 40 to 100 F OA SET...

Страница 24: ...inutes 0 to 15 minutes 2 MINUTES 0 SECONDS MOD DELAYTIME 10 seconds 0 to 60 minutes 0 MINUTES 10 SECONDS MOD MAX LAST 50 25 to 100 STOP MOD MAX 50 STOP BAND OFSET 5 F 0 to 50 F EARLY STOP 5 BLR STARTT...

Страница 25: ...r temperature when the DHW Demand terminals see a closed contact DHW tank temperature control calls for heat for example OP LIMIT SETPOINTS This is the temperature at the boiler outlet or header senso...

Страница 26: ...ly water temperature High water at low outside air means the design water temperature for maximum load at ODT or outside design temperature for the installation The other end of the reset curve is the...

Страница 27: ...ivate its end switch SYSTEM CLOCK Set the system clock time day of week month day and year on start up and after any power outage to ensure the data log time stamp information will be accurate LOCAL A...

Страница 28: ...should generally be left at factory default BAND ADVANCED SETUP MODULATION PID This parameter should generally be left at factory default ROTATION ADVANCED SETUP FIRING MODE Select the rotation method...

Страница 29: ...ogram will start and show an option screen Select Install USB Drivers to install the program onto the computer After the USB driver installation is complete select Install Firmware Update Plug a USB c...

Страница 30: ...rrow keys to scroll through the log entries entry number and date are on the first line of the log screen Each log entry includes three screens as described below The top line remains the same in all...

Страница 31: ...ntactors or other devices connected to it If all grounding is correct there may be an issue with radiated or induced electrical noise interference Thismaybecausedbyarcingacrossacontactor scontactswhen...

Страница 32: ...TER boiler to act as a MASTER the header sensor must be set to TYPEZ and there must be a header sensor present At power up the header sensor is auto detected If the temperature of the header sensor at...