![Ravenheat HE 120N Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/ravenheat/he-120n/he-120n_instructions-for-use-installation-and-servicingtion-and-servicing_3856514017.webp)
Supplied By www.heating spares.co Tel. 0161 620 6677
17
SALAMANDER CORROSION GUARD
Salamander (Eng) Ltd
Tel: (0121) 3780952 /4508
4.8.10 Hard water areas
If the area of installation is recognized as hard
water, it is recommended that a suitable water
treatment device is installed in the mains.
The water hardness can be determined by using
the standard test paper or by referring to local
water authority.
4.9 DOMESTIC
WATER
4.9.1
The domestic hot water must be in accordance
with the relevant recommendations of BS 5546.
Copper tubing to BS 2871 1 is recommended
for water carrying pipework and MUST be used
for pipework carrying potable water.
4.10 ELECTRICAL
SUPPLY
Warning: this appliance must be earthed
4.10.1
External wiring to the appliance must be carried
out by a competent person and be in accordance
with the current I.E.E. Regulations and local
regulations which apply. The Ravenheat boiler is
supplied for connection to a 230 V ~ 50 Hz single
phase supply.
The supply must be fused at 3 A.
NOTE. The method of connection to the
electricity supply MUST facilitate complete
electrical isolation of the appliance, by the
use of a fused, double pole isolator, having a
contact separation of at least 3 mm in all poles.
The point of connection to the electricity supply
must be readily accessible and adjacent to
the appliance except, where the appliance is
installed in a bathroom, this MUST be sited
outside the bathroom.
SECTION 5
INSTALLATION
5.1 WARNING
5.1.1
It is MOST IMPORTANT that this appliance is
installed in a VERTICAL POSITION, with the
flue air duct passing through the wall.
Make sure flue slopes 2.5° down towards the
boiler that is 45 mm/m fall per metre of flue
length
(Fig.11).
5.3
UNPACKING OF BOILER
5.3.1 IMPORTANT:
With regards to the Manual
Handling Operations, 1992 Regulations,
the following lift operation exceeds the
recommended weight for a one man lift.
5.3.2
- Stand the boiler carton upright.
- Open the top of the carton
- Rest the carton on the fl oor
(keeping the fl aps open)
- Turn the carton over with the boiler inside
and then pull tha carton
- Rest the boiler on the fl oor and remove the
polystyrene guards
5.2 DELIVERY
5.2.1
The appliance carton containing
a) boiler fully assembled with fl ue adaptor
b) installation instructions ,
user instructions and Benchmark log book
c) white paper template
d) hanging bracket
e) guarantee card
f ) Polythene bag containing
- 2-22 mm compression ball valves
complete with 3/4” washers
- 1-15 mm compression ball valves
complete with 1/2” washers
- 1- 15 mm compression ball valve
- 2 coach bolts and wall plugs
- screws and dowels
IMPORTANT NOTES :
T
his appliance will produce a plume of
condensation in cool weather.This is due
to the High Effi cency and hence low fl ue
gas temperature of the boiler.
See Optional extras (Fig.15)
5.4
POSITIONING OF THE BOILER
5.4.1
Remove the 2 lower and the 2 upper
screws that secure of the front panel,
and then lift off .
5.4.2
Unscrew the 4 screws that fasten the lower
grating on the casing and remove it from the
bottom of the casing
5.4.3
Make sure the casing and screws
are put to one side in a safe place.
Fig.11