![Raven SC1 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/raven/sc1/sc1_operation-manual_789079029.webp)
CHAPTER
4
Routine Machine Operation: Operator Liability
25
CHAPTER 4
ROUTINE MACHINE
OPERATION
NOTE:
The ISO UT must be calibrated specifically for the vehicle before being used to operate the SC1/TC1
system. Refer to the UT operation manual for additional assistance with using your UT display.
Refer to the UT display or Raven field computer operation manual for assistance with setting up and
starting a job, setting guidance lines, and other guidance settings during in-field operations.
OPERATOR LIABILITY
The Operator Liability Warning is displayed each time the SC1/TC1 system is powered on. If the operator does not
accept liability, the SC1/TC1 system will be disabled and cannot be reengaged until the liability warning is accepted.
FIGURE 1. Operator Liability Prompt
To proceed with normal operation of the SC1/TC1 GPS and auto-steering features, read and accept the Operator
Liability Warning.
Содержание SC1
Страница 8: ...CHAPTER 1 4 Raven SC1 TC1 Calibration Operation Manual for Tractors and Sprayers ...
Страница 28: ...CHAPTER 3 24 Raven SC1 TC1 software version 1 5 Calibration Operation Manual for Tractors and Sprayers ...
Страница 54: ...CHAPTER 5 50 Raven SC1 TC1 software version 1 5 Calibration Operation Manual for Tractors and Sprayers ...
Страница 66: ...CHAPTER 6 62 Raven SC1 TC1 Calibration Operation Manual for Towed Implements ...
Страница 98: ...CHAPTER 9 94 Raven SC1 TC1 Calibration Operation Manual for Towed Implements ...
Страница 104: ...CHAPTER 10 100 Raven SC1 TC1 software version 1 5 Calibration Operation Manual for Tractors and Sprayers ...
Страница 108: ...Index 104 Raven SC1 TC1 software version 1 5 Calibration Operation Manual for Tractors and Sprayers ...