![background image](http://html.mh-extra.com/html/raven/autoboom-ultraglide-xt/autoboom-ultraglide-xt_installation-manual_788964050.webp)
C
HAPTER
5
46
Viper Pro Installation & Operation Manual
4. Remove the bulkhead locking nut from the connector and place the connector back into the node mounting
box.
FIGURE 2. Node Harness Installed on Bulkhead (View from Inside Box)
5. Install the large, 31-pin connector from the UltraGlide XT node harness (P/N 115-0230-109) through the open
hole in the bulkhead from which the SYS BLKHD 5 connector was removed.
6. Thread the bulkhead locking nut that was removed from the SYS BLKHD 5 connector onto the 31-pin connector
to secure it.
FIGURE 3. Connector to be Removed
7. Disconnect the RAVEN CAN TO AUTOBOOM connector from the front-center of the node box, near the latch
pin.
8. Locate the CAN connector on the node harness and connect it to the open connection.
31-Pin Connector
from UltraGlide
XT Node Harness
Disconnected SYS
BLKHD 5
Connector
Содержание AutoBoom UltraGlide XT
Страница 39: ...3 Manual No 016 0171 122 Rev E 35 HYDRAULIC SYSTEM INSTALLATION HYDRAULIC SCHEMATIC ...
Страница 40: ...CHAPTER 3 36 Viper Pro Installation Operation Manual ...
Страница 64: ...CHAPTER 5 60 Viper Pro Installation Operation Manual WIRING DIAGRAM 2009 WIRING SCHEMATIC ...
Страница 65: ...5 Manual No 016 0171 122 Rev E 61 WIRING INSTALLATION 2010 2011 WIRING SCHEMATIC ...
Страница 66: ...CHAPTER 5 62 Viper Pro Installation Operation Manual 2012 NEWER WIRING SCHEMATIC ...
Страница 67: ...5 Manual No 016 0171 122 Rev E 63 WIRING INSTALLATION ...
Страница 68: ...CHAPTER 5 64 Viper Pro Installation Operation Manual ...