Vector Solo Waterborne Applicators - Operation
20
Ransburg
OPERATION
1. Ensure the On/Off switch is in the desired po-
sition for voltage.
Figure 11: Voltage On/Off Position
2. Ensure the voltage high/low switch is in the
desired position.
Figure 12: High/Low Voltage Selection
Figure 14: Air Pressure at Regulator
4. Increase air pressure to the applicator depend-
ing upon atomization requirements. Minimum
pressure is 2.75 bar (40 psig) at the handle .
Use either gauge from Maintenance and Test Kit
or use Table I to use a gauge reading at the wall
regulator adjusted for the pressure drop in the
air hose.
3. Open the fluid supply - 6.96 bar (100 psig )
maximum working pressure.
Figure 13: Fluid Supply Pressure Adjustment
VOLTAGE ON
VOLTAGE OFF
1 - Fluid Supply
2 - Flow Regulator
APPLICATOR
OPERATION
6 0 % V O L T A G E
1 0 0 % V O L T A G E
AH-08-03.6