BEFORE BEGINNING ASSEMBLY
TAKE INVENTORY:
You must complete an inventory within 60 days
of receiving your kit.
We check and re-check and are 99.9% certain that if we say we shipped it, we did. The
first task in building your kit is to inventory the parts using the packing list provided. It is
your job to keep all parts organized and accounted for. We cannot provide missing parts
cost free after 60 days. Use the supplied pack list to verify that everything that we
packed is in the box. The fast way to inventory is to use the Priority Number that
appears on the Part Number labels, these will match the pack list in numeric order. Go
through the list item by item. If anything is not there that should be, please contact our
parts department immediately.
HINT:
Use sections of plywood from the packing crate to fabricate a part
inventory board. As each part is inventoried and checked off on the pack
list, staple the bag to the board. This allows for quick identification and
part selection during assembly. Plywood can be attached to shop walls.
You may also
fabricate “A” Frame stands to support the plywood. Refer to
FIGURES 00-01
and
00-01A
.
IMPORTANT:
When hanging the parts on the board, use the aircraft section
designator of the part number to organize the parts. For an explanation of the part
number and the meaning of the letters in the prefix refer to ENGINEERING DEPT.
DRAWING NUMBERING SYSTEM.