12
SECTION 8
R715 ASSEMBLY
1. Remove the Tower Bolts. (See Fig. 8.1)
3. Using a shop crane or other lifting device, lower the
Tower onto the base and align the holes.
4. Attach the Tank / Tower assembly to the base using
the four bolts on the Tower Base Plate. (See Fig. 8.2)
Swing Arm / Vertical Shaft / Duckhead Assembly
1. Check the Swing Arm Assembly if necessary tighten
the Swing Arm Pivot Pin Nut until the Swing Arm will not
move and then back off one-half to one complete turn to
allow the Swing Arm to swing freely but without any play
in the assembly. (See Fig. 8.3)
3. Raise the Vertical Shaft / Duckhead assembly to the
highest position and lock it in place by Pushing the
Locking Handle Down.
4. Check the Socket Head Cap Screw on the Cap,
Tighten if necessary. (See Fig. 8.4)
5. Check the operation of the Vertical Shaft and the
Locking Handle (See Section 17, Page 29 for Lock
adjustment details)
6. Check that the Duckhead Bolt and Allen Set Screws
are tightened. (See Fig. 8.5 - 8.6)
Fig. 8.1
Fig. 8.2
Fig. 8.3
Fig. 8.4
Fig. 8.5
Fig. 8.6
Содержание R715
Страница 32: ...32...
Страница 33: ...33 RECORD ALL MAINTENANCE NOTES AND SERVICE HISTORY HERE...
Страница 34: ...34 5 7 5 1 5...