background image

 

EcoPro300 

 
Range Road Enterprises Ltd 
Box 944 
Eckville AB T0M 0X0 
www.range-road.ca

 

 

 

Range Road EcoPro300  

Firewood Processor 

 

 

 

 

Crated Unit 

Assembly Manual

 

Содержание EcoPro300

Страница 1: ...EcoPro300 Range Road Enterprises Ltd Box 944 Eckville AB T0M 0X0 www range road ca Range Road EcoPro300 Firewood Processor Crated Unit Assembly Manual...

Страница 2: ...ca Crated Unit 1 Undo 8 18mm x 19mm Nuts and bolts 2 on each leg of top frame 2 Lift top of Metal crate off and move out of work area 3 Remove Shrinkwrap 4 Remove and Unwrap components 5 Lift Unit of...

Страница 3: ...tightened then tighten the nuts 7 Once the bolts are tight tighten the nuts to lock the bolts in place 8 Mount the fenders on the axle snug the bolts but do not tighten holes in the fenders go to the...

Страница 4: ...he 13mm nuts and bolts 19 Install tripod leg in front mount and lower processor to the ground 20 If this unit was supplied with both a spring and a gas cylinder for the saw return it is up to the asse...

Страница 5: ...ace and re tighten the bolt 21 Mount sawdust chute to side of processor with Allan head boolts and 10mm nuts 22 Mount small safety cage with 4 13mm nuts and bolts 23 Remove 2 18mm bolts from swivel pl...

Страница 6: ...thout any bolts remove all 10mm nuts bolts place blue chainsaw cover on the end of safety cage and line up the bolt holes tighten all 10mm nut bolts 28 Remove 13mm nuts from bar oil tank and mount tan...

Страница 7: ...n place re tighten the nut to hold the plastic tubing and seal do not over tighten 34 Run the tubing through the safety cage make sure cage can open and close freely push the end of the tubing into th...

Страница 8: ...b holes and re insert the pin and roller 42 re insert cotter pin and bend the end of the cotter pin so it stays in place 43 Place the end of the log holder spring in the hole of the log holder and tig...

Страница 9: ...he swivel bar through the mount behind the axle 49 Re install the bolt washer and tighten 50 Install wedge adjustment plate and tighten 2 18mm bolts 19mm nuts 51 Pull the adjuster bar into postion 52...

Страница 10: ...he engine 55 Connect the battery terminals to the other end of the battery cables to red cable to black cable 56 Connect terminal to battery and tighten 57 Tighten bolts on chain and coupler 58 Remove...

Страница 11: ...ort arm to the processor with the 4 bolts provided 62 Mount the winch to the plate on the top of the support arm 63 Lift the conveyor section up and line up the holes in the leg with the tab holes and...

Страница 12: ...put lower pin through the leg and tabs to hold it in place 67 Lower the conveyor and place the second section of the conveyor upside down on the first section 68 Install bolts and washers at swivel po...

Страница 13: ...nd put the pin through the lacing 72 Connect the hydraulic hoses to the conveyor A is the pressure hose B is the return hose 73 when the conveyor is extended for use the safety clasp should be engaged...

Страница 14: ...osen the chain the two bolts can be loosened using a 12mm wrench Next the allen key bolt can be turned clockwise to tighten or counter clockwise to loosen the chain The two 12mm bolts can be tightened...

Страница 15: ...o tight a jammed piece of wood could tear belt 90 Grease conveyor bearings 2 at top of conveyor 1 at bottom 91 Check engine oil top up or fill as necessary 92 Add bar oil 94 Make sure all return hoses...

Страница 16: ...operating temperature 100 This valve is used to control the flow to the conveyor you can control the speed or shut it right off for cold starts this valve should be closed until the hydraulic oil is w...

Страница 17: ...from the factory but should always be checked 2nd The front bracket hits the post on the manual return arm as the ram returns home this must hit the post before the ram hits its internal stops soften...

Страница 18: ...EcoPro300 Range Road Enterprises Ltd Box 944 Eckville AB T0M 0X0 www range road ca...