54
UK
Servicing of the Burners.
(See section Conversion to bottled gas if necessary)
Remove the ceramic logs as described in points 1 - 4 under
Service.
The pilot plate guard is removed by loosening the two M5 screws with a
4 mm hex key.
By removing the two screws on the pilot unit with a 7 mm open-ended
spanner, the pilot unit can be raised a little. Fittings on the underside of
the pilot unit can be loosened by means of a 10 mm open-ended span-
ner. The thermosensor and pilot burner can be replaced.
To gain access to the nozzles on the main burner, the main burner unit
must be removed from the stove. This is done by removing the 4 bolts
holding the burner in place. Now the burner can be lifted out of the
combustion chamber. Now there is free access to the nozzles.
When parts are replaced, only replace these with original Rais/attika
specified parts.
Содержание NEXO 100 Classic Gas
Страница 1: ...1 POSITIV N E X O G A S GB UK ...
Страница 34: ...34 ceramic Logs Log 1 Log 2 Log 3 Log 4 Log 6 Log A Log B UK Log 5 ...
Страница 36: ...36 4 3 5 Log 3 Log 4 Log 5 UK ...
Страница 37: ...37 6 A B Log 6 Log A Log B UK ...
Страница 50: ...50 UK ...
Страница 51: ...51 UK ...
Страница 56: ...56 UK ...
Страница 72: ...72 Vertical Roof Terminal with Back outlet for more information see paragraph Location of chimney terminals UK ...
Страница 73: ...73 Horizontal wall Terminal for more information see paragraph Location of chimney terminals UK ...
Страница 85: ...1 2 3 4 5 NEXO Gas 100 120 140 160 185 ...
Страница 86: ...86 1 2 3 4 5 8 6 9 8 7 10 NEXO G Gas 100 120 140 160 185 ...
Страница 87: ...87 ...