24
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
Nexo G Gas - Retvinklet opstilling
01-04-2019
A3
10-6556
10
50
300
19
8
223
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
Nexo G Gas - Retvinklet opstilling
01-04-2019
A3
10-6556
10
50
300
19
8
223
Normal installation - at right angle
With side glass
A. Furniture distance (min.)
700 mm
Distance to flammable material (min.)
D. rear (wall)
50 mm
E. to side to wall
300 mm
UK
Содержание NEXO 100 Classic Gas
Страница 1: ...1 POSITIV N E X O G A S GB UK ...
Страница 34: ...34 ceramic Logs Log 1 Log 2 Log 3 Log 4 Log 6 Log A Log B UK Log 5 ...
Страница 36: ...36 4 3 5 Log 3 Log 4 Log 5 UK ...
Страница 37: ...37 6 A B Log 6 Log A Log B UK ...
Страница 50: ...50 UK ...
Страница 51: ...51 UK ...
Страница 56: ...56 UK ...
Страница 72: ...72 Vertical Roof Terminal with Back outlet for more information see paragraph Location of chimney terminals UK ...
Страница 73: ...73 Horizontal wall Terminal for more information see paragraph Location of chimney terminals UK ...
Страница 85: ...1 2 3 4 5 NEXO Gas 100 120 140 160 185 ...
Страница 86: ...86 1 2 3 4 5 8 6 9 8 7 10 NEXO G Gas 100 120 140 160 185 ...
Страница 87: ...87 ...