Quadnet Installation Instructions
32
Important Points
•
Use a
2-core 1.5mm
2
and earth/screen fire rated cable
similar to
FP200 or MICC
•
Connect all the devices in a
loop
returning to the control panel, with
radial spur circuits
only from Multipoint detectors
•
Make sure that the screen cables are sleeved, connected together
and connected to
earth only at the control panel
•
The commissioning engineer will require a list of
device serial
numbers
and their locations,
cable readings
and
as-wired
drawings
.
If you have any further queries, please contact your supplier for further information