Quadnet Installation Instructions
24
Commissioning Checklist
The following checklist may be used to ensure that all steps are taken. It serves as a reminder only and
may need additional items added if required.
Step 1
Description
Commissioning
Engineer
Checked
Low voltage test meter shows 0v and earth continuity, and no inter-core short
circuits. (+ve core will only have continuity if link pins fitted instead of devices.
One device installed and initialised satisfactorily.
Remainder of devices installed and initialised in sections until entire system is
initialised satisfactorily.
All faults (device, input, output, EOL, battery, etc,) cleared from control panel.
Correct operation and device poll verified using SitaDIAGNOSTIC
Step 2
Description
Commissioning
Engineer
Checked
Data Uploaded to PC
Configuration set up on pc
Data downloaded to control panel
Addressable loop reconfigured.
System Reset
All ancillary inputs and outputs connected and faults cleared
Step 3
Correct operation of all input devices tested, ie, detectors, manual call points and
inputs.
Correct operation of all output devices tested, ie, sounders, relays and outputs
Correct operation of all programmed actions tested, ie, instant, delays,
confirmation alarms, multi-stages
Step 4
System Manuals completed, zone chart or zone list displayed.
End user or responsible person trained and user manual issued.
Site Name & Address:
Commissioning Company:
Commissioning Engineer:
Signature:
Date: