INSTALLATION INSTRUCTIONS
29
T
S
4.3 Filling the condensate trap
The condensation trap must be pre-filled when
starting the boiler for the first time in order to
prevent flue gases from flowing back through
the trap.
The filling operation is carried out as follows
(see fig. 1):
•
Remove plug T and fill the trap S three
quarters full with water;
•
Replace plug T and connect the drainpipe
P into a condensate discharge trap
conforming to current legislation;
Attention! It is recommended to clean the
condensate trap, after a few months of boiler
operation and periodically to remove any
deposits/residuals that may interfere with
correct operation.
Fig. 1
Содержание RKR 24
Страница 2: ......
Страница 51: ...MAINTENANCE INSTRUCTIONS 48 POSITIONING THE IGNITION ELECTRODE AND THE IONISATION ELECTRODE 1 1 7 5 0 5 3 5...
Страница 64: ......
Страница 65: ......