55
EN
(1)
(3)
18
19
7.8 Preparing the awning for electrical connection and commissioning
1.
Finally, place the side cover
(1)
(if available) back
on the bearing block
(3)
.
2.
Release the ratchet straps from the joint arms.
3.
Finally, check that the installation work has been
carried out properly.