Page 50 of 69
SECTION 6: LINKAGES
Bag 6
6-1 RUDDER PUSH ROD INSTALLATION
No. Bag#
Description
Qty
1 In
box
Rudder Push Rod (in Box)
1
2
6
Rudder Push Rod End
2
3***** Electric
Tape
1
4
6
Rudder Pushrod Guide
2
5
6
Rudder Pushrod Guide Insert
2
6 HB
Shim
Ball
1
7
HB
M2x8 Phillips Screw
1
8***** Servo
Arm
1
9*****
M3 Servo Phillips Screw
1
10
6
2.3 Long Ball End
2
11***** CA
Glue
1
.The length of the Rudder
Rod measured from
center to center should
be around 533 mm for
Little Sweetie 10 and
554mm for Sweet 16V2.
.Put electric tape around
the Boom before
installing the Rudder
Push Guide in, so you
can remove them later.
Содержание Little Sweetie 10 Pro
Страница 1: ...Page 1 of 69...
Страница 7: ...Page 7 of 69 REQUIRED TOOLS Dremel Tools and Sandpapers would be helpful for building...
Страница 8: ...HARDWARE OPTIONAL ACCESSORIES GLUES AND THREAD LOCK COMPOUNDS RADIO MOUNTING ACCESSORIES Page 8 of 69...
Страница 13: ...Page 13 of 69 ASSEMBLY SECTION 1 REAR FRAMES Bag 1...
Страница 17: ...Page 17 of 69 SECTION 2 MAIN FRAMES Bag 2...
Страница 25: ...Page 25 of 69...
Страница 27: ...Page 27 of 69...
Страница 28: ...Page 28 of 69...
Страница 37: ...Page 37 of 69...
Страница 42: ...SECTION 5 A ROTOR HEAD for Little Quickie 10 Bag 5 Page 42 of 69...
Страница 44: ...Page 44 of 69...
Страница 53: ...Page 53 of 69...
Страница 54: ...Page 54 of 69...
Страница 55: ...Page 55 of 69...
Страница 59: ...Picture 3 Swash Up Picture 4 Head Picture 5 Tail Center Picture 6 Tail Positive Thrust Page 59 of 69...