Page 33 of 69
3-2 TAIL ROTOR SUBASSEMBLY
No. Bag# Description
Qty No. Bag# Description
Qty
1 3 Tail Case Side Plate
2
10
3
M2.3 Medium Ball Link
2
2
3
Tail Pitch Lever Mount
1
11
3
Tail Pitch Slider
1
3
3
5X11X4 Bearing
2
12
3
Tail Pitch Control Lever
1
4
HB
M2x6 Phillips Screw
2
13
HB
M3x5x1 Spacer
4
5
In Box
Tail Boom
1
14
HB
M3x16 Cap Head Bolt
1
6
In Box
Timing Belt
1
15
HB
M3 Locknut
1
7
HB
M3x6 Cap Head Bolt
6
16
3-1
Tail Pulley Gear Subassy.
1
8
3
Tail Case Cross Member
1
17
HB
M2.5x6 Cap Head Bolt
1
9
HB
M3x4 Pivot Ball Stud
2
18
HB
M3x7 Flat Washer
1
First, to prevent the Boom End from
rotating, drill a 2.5mm hole in the side of
the Boom End, then secure with an M2.5x6
Cap Head Bolt.
Install the Bearings into the Tail Case Side
Plates. The flanges should be inside.
Содержание Little Sweetie 10 Pro
Страница 1: ...Page 1 of 69...
Страница 7: ...Page 7 of 69 REQUIRED TOOLS Dremel Tools and Sandpapers would be helpful for building...
Страница 8: ...HARDWARE OPTIONAL ACCESSORIES GLUES AND THREAD LOCK COMPOUNDS RADIO MOUNTING ACCESSORIES Page 8 of 69...
Страница 13: ...Page 13 of 69 ASSEMBLY SECTION 1 REAR FRAMES Bag 1...
Страница 17: ...Page 17 of 69 SECTION 2 MAIN FRAMES Bag 2...
Страница 25: ...Page 25 of 69...
Страница 27: ...Page 27 of 69...
Страница 28: ...Page 28 of 69...
Страница 37: ...Page 37 of 69...
Страница 42: ...SECTION 5 A ROTOR HEAD for Little Quickie 10 Bag 5 Page 42 of 69...
Страница 44: ...Page 44 of 69...
Страница 53: ...Page 53 of 69...
Страница 54: ...Page 54 of 69...
Страница 55: ...Page 55 of 69...
Страница 59: ...Picture 3 Swash Up Picture 4 Head Picture 5 Tail Center Picture 6 Tail Positive Thrust Page 59 of 69...