BGA2015 OPERATION MANUAL
Page5
6. Install and Connect System
6.1 Place System
*
Unwrap the packing of the unit, then take out BGA EA-H10 Main Unit and put it on the
horizontal worktable.
* Make sure whether the unit and parts are in good conditions.
6.2
Install RPC
1. Unscrew RPC Fixing Knob on the RPC Fixing Bracket and install RPC in the Bracket ,
tighten knob.
2. Put the plug of RPC connecting wire into Camera Socket.
3. RPC’s position can be adjusted. Unscrew fixing knob in corresponding direction and then
adjust. RPC can be moved up and down or turned.
6.3
System Connecting
*
Please check whether the supply voltage accords with the rated voltage on the system
nameplate.
* Please check whether all switches are turned off .
* Connect the video cord of outside Indicator or Monitor to the VIDEO-OUT socket.
* Connect IR camera
(
RPC
)
to IR camera socket.
* Connect control box to socket.
* connect ground line to ground hole.
After all above steps, insert power plug into power sockets, and turn on switch.
Install RPC herein.
RPC Fixing Knob
RPC Fixing Bracket
Camera
RPC
(Reflow Process Camera)