MT VERNON E2 INSERT-C
D. Install Checklist
YES IF NO, WHY?
Verified clearance to combustibles.
Appliance is leveled and connector is secured to appliance.
Hearth extension size/height decided.
Outside air kit installed.
Floor protection requirements have been met.
If appliance is connected to a masonry chimney, it should be cleaned and
inspected by a professional. If installed to a factory built metal chimney, the
chimney must be installed according to the manufacturer’s instructions and
clearances.
Appliance Install
Chimney configuration complies with diagrams.
Chimney installed, locked and secured in place with proper clearance.
Chimney meets recommended height requirements (5 feet minimum vertical).
Roof flashing installed and sealed.
Terminations installed and sealed.
Venting/Chimney
Clearances
Verified all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Floor protection and heart extensions installed per manual requirements.
Appliance Setup
All protective materials removed.
All labels have been removed from the door.
All packaging materials are removed from inside/under appliance.
Manual bag and all of its contents are removed from inside/under the appliance
and given to the party responsible for use and operation.
!
WARNING! Risk of Fire or Explosion! Failure to install appliance to these instructions can lead to a fire or
explosion.
Hearth & Home Technologies recommends the following:
Photographing the installation and copying this checklist for your file.
That this checklist remain visible at all times on the appliance until the installation is complete.
Electrical
120 VAC unswitched power provided to the appliance.
Check outlet with multi-meter for proper polarity and voltage (115-120 VAC).
Record voltage reading: _____________
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this installation manual.
Customer:
Date Installed:
Lot/Address:
Location of Appliance:
Installer:
Dealer/Distributor Phone Number:
Serial Number:
Model Name:
__________________________________________________________________________
______________________________________________________________________
_______________________________________________________________________
________________________________________________________________
___________________________________________________________________________
________________________________________________________
______________________________________________________________________
_______________________________________________________________________
Started appliance and verified that all motors and blowers operate as they should.
Checked draft using a Manometer. Record readings: ______________________
Comments:
Further description of the issues, who is responsible (Installer/Builder/Other Trades, ets.) and corrective action needed:
Comments communicated to party responsible __________________________ by ______________________ on ____________
(Builder/Gen. Contractor)
(Installer)
(Date)
Checked vacuum using a Manometer. Record readings: ____________________