Mail Processing Data
6.4
Daily Usage Report
This report displays, for each day of the selected period, usage data such as total items
and total postage value.
Requirements
This report is available as a user or supervisor.
You have to enter the Begin date and the End date of the report. The default End date is
then 31 days later.
You can specify another End date.
Default period:
• Begin = 1st day of the current month
• End = Current day.
Output
• Screen
• USB printer
• USB memory key
Content
Comments
Fields
On printed report only
Meter Serial number
For each day in the period:
• Day number
• Number of items processed (zero and non-zero)
• Total postage value for this day
128
| Page 128 | Jan-13-2017 10:45 |
6
Repor
ts
Содержание IN-600
Страница 1: ...User Guide IN 600 Mailing Systems ...
Страница 5: ... Page 4 TOC Jan 13 2017 10 45 ...
Страница 7: ......
Страница 15: ......
Страница 27: ......
Страница 89: ...The Label Dispenser can hold up to 40 labels 84 Page 84 Jan 13 2017 10 45 3 Processing Mail ...
Страница 91: ......
Страница 99: ......
Страница 125: ......
Страница 147: ......
Страница 155: ......
Страница 177: ...Geodesic 172 Page 172 Jan 13 2017 10 45 8 Configuring your Mailing System ...
Страница 178: ...Geodesic codes 8 Configuring your Mailing System 173 Page 173 Jan 13 2017 10 45 ...
Страница 189: ......
Страница 191: ......
Страница 205: ......
Страница 225: ......
Страница 227: ......
Страница 239: ......
Страница 241: ......
Страница 245: ...Additional information See also How to Use the Feeder on page 35 240 Page 240 Jan 13 2017 10 45 12 Specifications ...
Страница 253: ... Index Page 248 Jan 13 2017 10 45 A0079314 C 13 01 2020 ...
Страница 254: ...A0079314 C 13 01 2020 ...