UM-PRORUNNER_Mk5-1.2-EN-US
87
Maintenance RollerDrive conveyor
8.2.3
Monthly maintenance
/i
8.2.4
6-monthly maintenance
/i
8.2.5
2-yearly maintenance
1
/i
Item
Task
Action when required by the
check
Photocells
Check for visible damage.
Replace the photocell and the
reflector if necessary. Refer to
section
.
Check for loose parts.
Fasten loose parts.
Clean. Refer to section
.
Cabling
Make sure that all cables are
securely fastened.
Connect the cables again if
necessary.
Item
Task
Action when required by the
check
All bolt connections
Check all bolt connections.
Tighten bolts using the correct
tool and torque.
1
Or after 10,000 running hours, whichever comes first.
Item
Task
Action when required by the
check
Drive roller
Follow the instructions in the
manual of the manufacturer of
the drive roller.
Replace the drive roller.
Содержание PRORUNNER Mk5
Страница 1: ...User Manual PRORUNNER Mk5 Version1 2 26 06 2014...
Страница 12: ...About this manual 12 UM PRORUNNER_Mk5 1 2 EN US...
Страница 22: ...Safety 22 UM PRORUNNER_Mk5 1 2 EN US 3 5 Safety symbols on the machine Terminal 12 Nm...
Страница 38: ...Description 38 UM PRORUNNER_Mk5 1 2 EN US...
Страница 58: ...Installation 58 UM PRORUNNER_Mk5 1 2 EN US...
Страница 84: ...Maintenance vertical conveyor 84 UM PRORUNNER_Mk5 1 2 EN US...
Страница 94: ...Maintenance belt conveyor 94 UM PRORUNNER_Mk5 1 2 EN US...
Страница 98: ...Maintenance gravity roller conveyor 98 UM PRORUNNER_Mk5 1 2 EN US...
Страница 108: ...Maintenance driven roller conveyor 108 UM PRORUNNER_Mk5 1 2 EN US...
Страница 120: ...CE declaration of conformity 120 UM PRORUNNER_Mk5 1 2 EN US...
Страница 174: ...Exploded views of product conveyors 174 UM PRORUNNER_Mk5 1 2 EN US...
Страница 198: ...Electrical circuit diagrams 198 UM PRORUNNER_Mk5 1 2 EN US...
Страница 200: ...Assembly instruction 200 UM PRORUNNER_Mk5 1 2 EN US...