Installation
52
UM-PRORUNNER_Mk5-1.2-EN-US
6.4
Preparations for a Qimarox supervised installation
(optional)
The preparations described below must be completed before Qimarox can assemble the
machine on site. All equipment listed below must be present before and during assembly.
1.
Indicate the contact person to whom Qimarox’s engineer must report when arriving or
leaving before and after the assembly. This only applies when Qimarox supervises the
assembly.
2.
Make sure that Qimarox’s engineer is assisted by two qualified client engineers. Refer
to section
3.
Make sure that the place where the assembly takes place:
-
is accessible, has sufficient light and is at room temperature.
-
has been laid out such that the engineers can work quietly and safely there.
-
is suitable for drilling and/or grinding, if necessary.
4.
Provide hoisting equipment:
-
preferably a bridge crane, minimum carrying capacity 1.5 x the weight of the
machine.
-
or a fork-lift truck combined with a hoist with a minimum capacity of 2 x the weight
of the machine at a lifting height of 4 metres. Refer to section 6.3.3 and section
6.3.4.
5.
Provide electric power (230 V AC) at a maximum of 5 metres from the place of
assembly of the machine.
6.
Provide the correct safety provisions:
-
Moveable scaffolding or a hydraulic hoist.
-
Personal protection equipment.
6.5
Installing the machine
6.5.1
Preparation
1.
Make sure that a hoisting system above the machine is available. Refer to section
.
2.
Make sure that the surface is level and meets the requirements for supporting the total
weight of the transport system. Refer to the machine layout drawing.
3.
Keep the rear side of the machine, especially the top of the drive, accessible for
service. Maintain a free space of approximately 800 mm.
DANGER
•
The machine must be set up by qualified personnel. Refer to section
•
Machines higher than 4 metres must be laterally supported in order
to provide sufficient stability in the lift column. Refer to the machine
layout drawing.
Содержание PRORUNNER Mk5
Страница 1: ...User Manual PRORUNNER Mk5 Version1 2 26 06 2014...
Страница 12: ...About this manual 12 UM PRORUNNER_Mk5 1 2 EN US...
Страница 22: ...Safety 22 UM PRORUNNER_Mk5 1 2 EN US 3 5 Safety symbols on the machine Terminal 12 Nm...
Страница 38: ...Description 38 UM PRORUNNER_Mk5 1 2 EN US...
Страница 58: ...Installation 58 UM PRORUNNER_Mk5 1 2 EN US...
Страница 84: ...Maintenance vertical conveyor 84 UM PRORUNNER_Mk5 1 2 EN US...
Страница 94: ...Maintenance belt conveyor 94 UM PRORUNNER_Mk5 1 2 EN US...
Страница 98: ...Maintenance gravity roller conveyor 98 UM PRORUNNER_Mk5 1 2 EN US...
Страница 108: ...Maintenance driven roller conveyor 108 UM PRORUNNER_Mk5 1 2 EN US...
Страница 120: ...CE declaration of conformity 120 UM PRORUNNER_Mk5 1 2 EN US...
Страница 174: ...Exploded views of product conveyors 174 UM PRORUNNER_Mk5 1 2 EN US...
Страница 198: ...Electrical circuit diagrams 198 UM PRORUNNER_Mk5 1 2 EN US...
Страница 200: ...Assembly instruction 200 UM PRORUNNER_Mk5 1 2 EN US...