Maintenance vertical conveyor
80
UM-PRORUNNER_Mk5-1.2-EN-US
Install the sprocket wheel
1.
Install the sprocket wheel with clamping
bush onto the shaft.
2.
Align the sprocket wheel. Use a ruler (A)
to align the sprocket wheel with the side
guides (B) of the chain.
3.
Fix the clamping bush in the indicated
sequence.
4.
Fix the clamping bush.
Use the following torques:
•
shaft diameter
≤
40 mm: 17 Nm
•
shaft diameter
≤
65 mm: 41 Nm
•
shaft diameter
≤
95 mm: 83 Nm
5.
Install the chain. Refer to section
6.
Install the guard. Refer to section
.
Tip
Illustrations for installing: see the illustrations above for uninstalling.
WARNING
A poorly aligned sprocket wheel
will damage the chain.
B
A
1
6
5
4
3
2
7
8
I
Содержание PRORUNNER Mk5
Страница 1: ...User Manual PRORUNNER Mk5 Version1 2 26 06 2014...
Страница 12: ...About this manual 12 UM PRORUNNER_Mk5 1 2 EN US...
Страница 22: ...Safety 22 UM PRORUNNER_Mk5 1 2 EN US 3 5 Safety symbols on the machine Terminal 12 Nm...
Страница 38: ...Description 38 UM PRORUNNER_Mk5 1 2 EN US...
Страница 58: ...Installation 58 UM PRORUNNER_Mk5 1 2 EN US...
Страница 84: ...Maintenance vertical conveyor 84 UM PRORUNNER_Mk5 1 2 EN US...
Страница 94: ...Maintenance belt conveyor 94 UM PRORUNNER_Mk5 1 2 EN US...
Страница 98: ...Maintenance gravity roller conveyor 98 UM PRORUNNER_Mk5 1 2 EN US...
Страница 108: ...Maintenance driven roller conveyor 108 UM PRORUNNER_Mk5 1 2 EN US...
Страница 120: ...CE declaration of conformity 120 UM PRORUNNER_Mk5 1 2 EN US...
Страница 174: ...Exploded views of product conveyors 174 UM PRORUNNER_Mk5 1 2 EN US...
Страница 198: ...Electrical circuit diagrams 198 UM PRORUNNER_Mk5 1 2 EN US...
Страница 200: ...Assembly instruction 200 UM PRORUNNER_Mk5 1 2 EN US...