background image

Q.SMART

Installation and operation manual for Q.SMART, Q.SMART UF, 
Q.SMART UF L – Generation G1.3

CIGS SOLAR MODULES

Valid for Europe

DRAFT

Содержание Q.SMART Series

Страница 1: ...Q SMART Installation and operation manual for Q SMART Q SMART UF Q SMART UF L Generation G1 3 CIGS SOLAR MODULES Valid for Europe...

Страница 2: ...CYCLING PAGE 16 9 CONTACT PAGE 17 10 APPENDIX APPLICATION NOTE GROUNDING PAGE 18 Technical parameters and design are subject to change The data sheets and customer information valid at the point in ti...

Страница 3: ...nstructions please first contact your system supplier You can find more information at our website www q cells com Q CELLS CIGS solar modules allow you to directly transform the unlimited energy provi...

Страница 4: ...erating Manual by Q Cells for further information on ap proved installation and use of this product Warning ElEctrical Hazard Do not disconnect under load Q SMart UF l 100 PrOdUct Field wiring Copper...

Страница 5: ...yourself to the national regulations for work safety and accident prevention Wear suitable protective clothing e g safety shoes protective gloves in order to prevent injuries Protect the modules again...

Страница 6: ...s Solar modules are not explosion proof operating equipment The modules are not suitable for mobile usage or for indoor installations Optimal solar irradiation results in a maximum energy yield For th...

Страница 7: ...ools mounting materials or solar modules can fall and injure people Block off the danger area on the ground before begin ning the assembly work Warn people near the danger area or in the building Keep...

Страница 8: ...ules may be installed in landscape or portrait format Install the module in such a way that the junction box is positioned in the upper area of the module and the wires hang downwards Ensure that the...

Страница 9: ...ted as a coordinated unit To ensure a long term stability of the solar modules Install the module according to the mounting variants and the defined clamp areas Please refer to the Q CELLS clamp list...

Страница 10: ...s edge to the first active cell is 18 5 mm Figure 3 Ensure that clamps overlap the glass edge Figure 3 10 mm to 15 mm on the top side of the module 12 16 mm on the module back side These specification...

Страница 11: ...mm Clamp height corresponding to 36 mm frame height Figure 4 Clamp depth 7 12 mm Figure 4 Clamp area clamp depth x clamp width 600 mm Clamps that comply to the local statics requirements Clamps that...

Страница 12: ...to account all working conditions and relevant technical regu lations and standards In this way you ensure that the maximum system voltage including the necessary safety supplements are not exceeded A...

Страница 13: ...commendations for Countries with Grounding Requirements apply Exception installation within 500 m of coastline The grounding recommen dations for Countries with Grounding Requirements apply COUNTRIES...

Страница 14: ...mum voltage system or b ground fault currents 50 mA don t exceed a length of time of 0 4 s are detectable and preventable with certainty A simple ground fault safety device must not be used Specificat...

Страница 15: ...lar cables and insulated compatible connectors Q SMART modules uses MC4 connectors Only use additional components which are compatible with the modules and its electrical specifications Ensure that al...

Страница 16: ...water from the module Do not use abrasive detergents or surface active agents e g soap Do not scratch dirt off This can damage the surface of the module Modules must not be covered by snow or ice for...

Страница 17: ...allee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 3494 66 99 0 FAX 49 0 3494 66 99 199 EMAIL service q cells com WEB www q cells com Subject to change Q Cells SE Installation and operation manual C...

Отзывы: