EZ Plate™ Storage Water Heater
19
PV500-64 12/14
8.7 Recommended Maintenance Schedule
1. Annual Maintenance
a. Check all joints, pipe connections and the heat exchanger for tightness, corrosion or deterioration.
b. Check all pumps, valves, controls and devices including thermostats for proper operation.
c. Check relief valves for proper operation.
d. Test high limit and operating temperature controls.
2. Semi-Annually
a. Recalibrate all indicating and recording gauges.
b. Check piping and wiring of all interlocks and shutoff valves.
3. Monthly Maintenance
a. Test low-water cutoff device (if equipped).
b. Check gauges, monitors, and indicators.
c. Check instrument and equipment settings.
4. As Required
a. Tank flush and cleanout.
b. Clean heat exchanger
c. Clean domestic water Y-strainer near circulator pump
d. Blow down or clean boiler water Y-strainer