Spectra UV
Revision D
/
January 2022
Page 11 of 47
Setup
206B
Before you operate the system, know the system components. Complete the steps
instructed below for safe and correct operation. Refer to the separate Installation
Guidelines for information on transportation and unpacking.
422B
Warning: The following procedures should be done by qualified persons in accordance
with this manual and applicable safety regulations. A “qualified person” is defined as
“a person or persons who, by possession of a recognized degree or certificate or
professional training, or who, by extensive knowledge, training, and experience, has
successfully demonstrated the ability to solve problems relating to the subject
matter and work.” (ref. ANSI/ASME B30.2-1983.)
Installation
1.
36B
Plug the machine into an appropriate power source. Refer to the legend plate on the
electrical enclosure door. The electrical service should be correctly grounded and
the power source clean. A line conditioner may be necessary if there is high power
equipment operating off the same source. Poor quality power can cause errors.
423B
Warning: Failure to comply with electrical specifications can cause machine damage
and injury to installation personnel. Electrical hookups must be made by a qualified
electrician and comply with any applicable local standards.
2.
37B
Connect the ¼” NPT female fitting at the rear of the machine to a source of clean,
dry air. A hose of ¼” inside diameter is sufficient.
3.
38B
Close any access doors and engage the “
Emergency Stop
” button.
4.
39B
Turn the main air supply to “
SUP
”.
5.
40B
Turn the power switch on the electrical enclosure to “
On
”.
1B
Figure 2: Power Switch "On"