Installation Guide / PostMount 1-A with ECO-Rail
6
Code-Compliant Planning and Installation Guide V 2.2 - Complying with AS/NZS1170.2: 2011 ADMT 4-2016
Installation Instructions
Dig a hole to the diameter 300-400mm and depth 1200-1400mm
highlighted in the PM1-A engineering letter. Cover the bottom of
the hole with 50-70mm gravel.
Place the pole into the middle of the hole and fill it with concrete.
Maintain the position of the post. The allowed vertical tolerance
is ±2°.Keep the axle of the 2- Ø14 holes parallel to East-West;keep
the vertical angle deviation within ±5°.For more than one system
on one site maintain all the axles of 2- Ø14 holes aligned.
1) As show in figure on the right, with M12 * 120 hex bolts and nuts
to lock Angle Steel 63*40*1010 on the Pole. And then use M12 *
120 hex bolts and nuts to lock supporting rod 40 * 40 * 682 on the
Pole.
Note: supporting rod around multiple holes which can be
adjusted by adjusting the mounting, adjustable angle of 10 °, 20 °,
30 °, 40 °, 50 ° and 60 °.
Recommended torque for M12 bolts is 40~45 N·m
Cement mortar
Gravel
- Installation Instructions -
1. Pole 83*2400 Installation
2. PostMount 1-A Kit Installation