Installation Guide / PostMount 1-A with ECO-Rail
7
Code-Compliant Planning and Installation Guide V 2.2 - Complying with AS/NZS1170.2: 2011 ADMT 4-2016
2) As show in figure on the right, place the ECO-Rail on Angle Steel.
Use the Cross Connection Clamp, Cup head square neck bolts
M8*25, Hexagon nut with flange M8 to lock on the Angle Steel 63 *
40 * 1010.
Recommended torque for M8 bolts is 18~20 N·m
3) Position the PV Panel landscape by aligning the centre line
with the ECO-Rail. And fix the PV Panel to the Rails by using End
Clamps.
Recommended torque for M8 bolts is 18~20 N·m
- Installation Instructions -