Installation Guide / PostMount 1-A with ECO-Rail
5
Code-Compliant Planning and Installation Guide V 2.2 - Complying with AS/NZS1170.2: 2011 ADMT 4-2016
- System Overview -
Safe Torques
Please refer to safe torques defined in this guide as shown in the figure below. If power tools are required, Clenergy
recommends the use of low speed only. High speed and impact drivers increase the risk of bolt galling (deadlock). If
deadlock occurs and you need to cut fasteners, please make sure that there is no load on the fastener before you cut it.
Avoid damaging the anodized or galvanized surfaces.
All drawings and dimensions in this installation guide are for generic reference. The PV-ezRack® PostMount 1-A is to
be optimized to suit specific conditions for each project and documented in engineering drawings. As a result, major
components of the PV-ezRack® PostMount 1-A may be provided in sectional sizes and lengths that vary from those
shown in this guide. The installation operations detailed in this instruction guide remain the same regardless of the
component size. In case you need to do any on-site modifications or alteration of the system in a way that would
be different from engineering drawings, please provide marked up drawings/sketches for Clenergy’s review prior to
modification for comment and approval.
3. Installation Dimensions