2
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2022
What's Inside
Puretec Customer Service
Thank you for purchasing a Puretec Treatment System. Your system is a proven performer
manufactured from only quality materials and components. It will give years of reliability
and trouble free operation if maintained properly.
This user guide is designed for Puretec Treatment Systems. Be careful to ensure the
information and illustration is applicable to your particular unit.
Caution: Do not use with water that is microbiologically unsafe or without
adequate disinfection before or after the system.
The systems are designed for metropolitan supply water but can be used in other
situations. For other types of water supply, please contact your local Puretec dealer.
Puretec Treatment Systems are designed to run economically for many years, dependent
on the initial installation and periodic maintenance.
Flush system for 5 minutes or more, after any period of non-use, more than 2 weeks.
Note:
For point of entry installations an approved dual check backflow prevention device
must be installed. When line pressure exceeds 600 kPa, a pressure limiting valve must be
installed.
What's Inside
Puretec Customer Service ............................................................................................................................2
Installation Record ............................................................................................................................................3
Before Installation ..............................................................................................................................................4
Fig.1 - NTS Exploded Diagram ....................................................................................................................6
NTS Model Information ...................................................................................................................................6
Fig. 2 - NTX Exploded Diagram ................................................................................................................13
NTX Model Information ................................................................................................................................14
Installation Procedure ...................................................................................................................................19
Maintenance .......................................................................................................................................................23
Media Replacement ........................................................................................................................................23
Personal Protective Equipment ................................................................................................................24
Tank Cleanout (Yearly) ..................................................................................................................................24
Blending Valve Operation (NTX systems) ...........................................................................................24
Bypass Valve Operation - (Optional Accessory) .............................................................................25
Troubleshooting Guide ..................................................................................................................................26
Warranty ...............................................................................................................................................................27
Содержание NTS Series
Страница 28: ......