28
Pure Cold INSPIRATION2 Installation, Maintenance Manual 2022 | Issue Date: AUG 2022 REV 1
It is the contractor
’
s responsibility to ensure all electrical installations
comply with local regulations, codes or legislation.
Any screw connections should be tightened at the terminal strip. Tight-
en every one as part of the installation procedure. Doing this will elimi-
nate any possible burning of these terminals after installation.
Plug and Chord connections should also be checked in case of any loos-
ening from transport vibration.
The plug cord fitted to the case is 16 ft long with NEMA L14
-
20P plug and
exits the case at the bottom left hand side
Outlet box for unit requires a requires a 115/208V 60Hz 4 wire grounded
connection. Mounting of outlet box requires a rigid and secure support for
NEMA twist
-
lock plug. Per NEC 314.23 guideline " Enclosures mounted on a
building or other surface shall be rigidly and securely fastened in place, if
the surface does not provide rigid and secure support, than additional sup-
port
in accordance to this
section shall be provided".
All flexible cords must meet OSHA standards and provide strain relief per
NEC 400.14 that states " flexible cords and cables shall be connected to de-
vices
and to fittings so that tension is not transmitted to joints or termi-
nals."
To avoid serious injury
from electrical shock
ALWAYS disconnect
the electrical power at
the main disconnect
when servicing or re-
pairing any electrical
component
Содержание 2CSMA1
Страница 2: ...2 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 5: ...5 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 6: ...6 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 23: ...23 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 26: ...26 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 31: ...31 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...
Страница 40: ...40 Pure Cold INSPIRATION2 Installation Maintenance Manual 2022 Issue Date AUG 2022 REV 1...